BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 18, 2024 at 7:00 PM

Updated January 29, 2024

Renovation of a water / sewer project in Warren, Michigan. Completed plans call for the renovation of a water / sewer project.

Reference Number 0000339059 Spill bucket repair; see scope of work attachment for work needed to be done. Question Acceptance Deadline 01/13/2024 12:00 AM EST Questions are submitted online No Bids shall be submitted by the date specified and at or prior to the time specified to be considered. Late bids, e-mail, telegraphic, or telephone bids will NOT be accepted. 1. Make work area safe by barricading tank pad for repairs 2. Remove existing Regular T1 North Spill Bucket. 3. Furnish & Install one (1) new OPW 5-Gallon Spill Bucket, nipple, Coax fill adapter, cap and new 61 SOP-4012 Coax Drop Tube. 4. Remove Existing Regular T2 South Spill Bucket. 5. Furnish & Install one (1) new OPW 5-Gallon Spill Bucket, nipple, Coax fill adapter, and cap. Re-use existing Drop Tube. 6. Re-test New Spill Buckets and fill out proper testing forms. 7. Pour new concrete around repairs. Pin everything in place. Clean up any debris

Post-Bid

Water / Sewer

$317,700.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
321
Active Projects
117
Bidding Soon
2,507
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2024

February 16, 2024

Project location map

Multiple Locations, Warren, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.