BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Bloomington, Indiana. Completed plans call for site work for a municipal facility.

Bid results will be published Electronically . Bryan Hall 601 East Kirkwood Avenue Bloomington, IN 47405 A Unified Bid is requested for all work in this project, including General, Mechanical, and Electrical Construction work. Deliver the original check (for all orders) to Eastern Engineering-Fishers Office, 9901 Allisonville Rd, Fishers IN 46038. Digital and Printed Sets of Bidding Documents may be ordered per the options listed on the Order page (plus Processing Fee/Eco Fee, and Shipping/Delivery and Tax when applicable). Credit Card or Eastern Engineering Charge Account required (before printing) for purchases. All bid proposals shall be in full accord with the Bidding Documents, which are on file with the Owner and may be examined by prospective Bidders: VPCPF Support Resources - Construction Procurement Indiana University bidtab@indiana.edu 812-855-5294 Each bid must be accompanied by: a completed Minority, Womens and Veterans Business Enterprise Participation Plan, detailing the good faith efforts of the contractor to include minority, women and veteranowned enterprises as subcontractors or material suppliers on the Project; a bid security for 5% of the total bid; and the contractors written drug testing program, which must be in full compliance with IC 4- 13-18. The Owner reserves the right to accept or reject any bid and to waive any irregularities in bidding. The Owner may consider a bid to be incomplete if it does not provide the required documentation as described in this Notice, including but not limited to the Minority, Womens and Veterans Business Enterprise Participation Plan. The Base Bid may be held for a period not to exceed sixty days before awarding Contracts. All Alternate Bids may be held for a period not to exceed ninety days before award and incorporation into the contract by proper Change Directive. Should a successful Bidder withdraw his bid or fail to execute a satisfactory Contract within ten days after notice of acceptance of bid, the Owner may declare the Bid Security forfeited as liquidated damages, not as penalty.

Award

Water / Sewer

$390,500.00

Public - State/Provincial

Site Work

13

21

7

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
30
Bidding Soon
888
All Active Projects
338
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2024

February 29, 2024

img_map_placeholder

Multiple Locations, Bloomington, IN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.