BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 18, 2025 at 7:00 PM

Updated November 19, 2025

Site work and paving for a mixed-use development in Balch Springs, Texas. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000339021 Assist the City in improvements to Hickory Tree Road by providing the following engineering services related to roadway design, utilities improvements, right of way (ROW) acquisition, environmental engineering, drainage design, pedestrian design, traffic engineering and construction management for Hickory Tree Road in accordance with the 2022 Balch Springs Hickory Tree Road Planning Study by the North Central Texas Council of Governments (NCTCOG), 2019 Balch Springs Mobility Plan and 2036 Balch Springs Comprehensive Plan. The firm hired is to provide contract-related engineering and design services, including but not limited to the following areas: Project scope to include design of Hickory Tree Road as denoted in the attached Exhibit A location map from Lake June Road to Elam Road with improvements consisting of reconstruction of a two-lane roadway to a three-lane concrete roadway with pedestrian improvements including a 6-foot sidewalk and 12' shared use path. Project shall also be designed in coordination of any planned or existing intersection improvements at Lake June Road at Hickory Tree Road and/or provide recommended intersection improvements at Hickory Tree Road at Elam Road. Project scope shall also be designed to coordinate any improvements to the drainage system along Hickory Tree Road, coordination with Mesquite Independent School District (MISD) and STAR Transit local fixed route along the corridor. Question Acceptance Deadline 01/19/2024 at 5:00 PM CT Questions are submitted online No -- All questions and inquiries regarding the RFQ must be submitted in writing to Chris Dyser, Development Director, by mail, or via email. As of November 18, 2025, an issuance of short-listed firms has not been released. A design firm selection timeline has not been disclosed.

Conceptual

Roads / Highways

$3,700,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
422
Active Projects
209
Bidding Soon
3,793
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2026

Project location map

Hickory Tree Rd, Balch Springs, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.