BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Allen Park, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Pinecrest Drive (Pelham Road to Southfield Road) o Approx. 14,750 Lineal Feet Saw-cut to Full Depth along curb line and remove straight curb; o Approx. 22,500 Syd - Rotomill existing pavement; o Approx. 5,000 Syd - Remove excess concrete, milling , grade and compact; o Approx. 22,500 Syd of HMA pavement 5EMH Super Pave Wearing course, 2" thick; o Approx. 22,500 Syd of HMA pavement 4EMH Super Pave Leveling course up to 2 1/4" thick; o Where applicable, Approx. 7,000 Syd HMA pavement 4EMH Super Pave Leveling course; o Approx. 14,750 Lineal feet of 4 inch mountable concrete Curb and Gutter; o Approx. 1,750 Cubic Yards of 12 inch Undercut (If necessary); o Remove and Replace conc walk, 6,500 Square Feet, 4" thick; o Misc 67 ADA Truncated Dome; o Misc. 18 Structure Rebuilt; if needed o Adjustment of 7 structure covers (utilizing EJ Above-Ground Adjustment Riser); o Misc drainage structures removal and replacement; o Traffic Maintenance and Control, Restoration, Clean-up; o Approx. 4,500 Lineal Feet of Road Striping; o All other related work. Sealed envelopes containing the bid shall be labeled as follows: Bid: Pinecrest Drive Pavement Improvement Allen Park, Michigan Attention: Mr. Mike Mizzi, City Clerk All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Question Deadline 02/12/2024 Additional Pre bid meeting Note: ENGINEER shall transmit to all such Bidders of record such addenda as ENGINEER considers necessary to provide clarification, in response to questions arising therein, or arising subsequent. Oral statements shall not be relied upon and shall not be considered as legally effective or binding. All inquiries shall be directed to C.E. Raines Company at telephone at 734-285-7510. All bids shall remain firm and may not be withdrawn for Ninety Days (90) days after the actual date of opening thereof. A properly completed Bid Bond, Certified Check or Cashier's Check in a sum not less than five (5) percent of the proposed amount of the proposal submitted, shall accompany each proposal as security for acceptance of the Contract by the lowest qualified bidder. Should the Contractor fail to enter into a Contract agreement with the Owner, through no fault of the Owner, he shall forfeit the entire amount of the security to the Owner. The City of Allen Park does not discriminate on the basis of race, color, religion, sex, or national origin. The City of Allen Park reserves the right to accept or reject any or all proposals, waive any irregularity in any proposal, and make an award of Contract in any manner, deemed in its best interest. Proposals submitted after the exact time specified for receipt shall not be considered.

Award

Roads / Highways

$2,690,665.00

Public - City

Paving, Site Work

9

18

4

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
102
Bidding Soon
1,501
All Active Projects
617
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

May 6, 2024

img_map_placeholder

Pinecrest Dr, Allen Park, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.