Demolition, site work and addition to a mixed-use development in Spokane, Washington. Completed plans call for the addition of a medical facility; for the demolition of a medical facility; and for site work for a medical facility.

https://www.spokanejournal.com/articles/16042-renovations-planned-at-mann-grandstaff-veterans-medical-center Mann-Grandstaff plans $150M in renovations, upgrades New Spokane Valley clinic set to open this fall near Vet Center Mann-Grandstaff44_web.jpg Construction is underway at Mann-Grandstaff VA Medical Center's northwest Spokane campus, where $150 million worth of capital improvements will help increase access to care for veterans. | Erica Bullock June 6, 2024Erica Bullock Mann-Grandstaff VA Medical Center has 29 capital improvement projects planned and underway in Spokane County that are valued at a total of $150 million. The improvements are part of a multiyear effort to increase access to medical care for veterans and the community at Mann-Grandstaff, which is located on 35 acres and has 75,000 square feet of building space at 4815 N. Assembly, in northwest Spokane. David Arment, chief of engineering at Mann-Grandstaff, says three major projects are already in the works, each valued at about $20 million, that are intended to improve care provided at the medical center. A 9,900-square-foot addition at the northwest Spokane campus community living center will create individual rooms for patients receiving care in the 34-bed facility. Renovations also are planned at the behavioral health building on the campus, with both of the projects scheduled to start by fall, Arment says. Advanced Technology Construction Corp., of Tacoma, Washington is the general contractor of the community living center project, and AES Group Inc., of Parker, Colorado, is the architect, says Bret Bowers, public affairs officer at Mann-Grandstaff. Design plans by Tempe, Arizona-based Aesus Design Group for the behavioral health renovation project show improvements to the existing 7,900-square-foot building will primarily focus on replacing mechanical equipment units and plumbing. A 515-square-foot mechanical room expansion and sidewalk improvements are also planned at the site. Mechanical, electrical, and plumbing engineering services also will be provided by Aesus, as well as landscape architecture. Highlands Ranch, Colorado-based Calibre is the civil engineer, and Thornton Tomasetti, of San Diego, is the structural engineer for the mental health project, design plans show. A third project—improvements for a 17,000-square-foot new clinic space at 12509 E. Mirabeau Parkway, in Spokane Valley, is expected to wrap up in October. Spokane Valley-based Divcon Inc. is the general contractor, and Leo A. Daly, of Dallas, is the architect for the Spokane Valley clinic, says Bowers. The Spokane Valley clinic is located about a half-mile west of the Spokane Vet Center, located at 13109 E. Mirabeau Parkway. Kevin Bratcher, executive assistant to the director of the medical center, says securing the lease of the Spokane Valley clinic is a double win for the organization. "We've run out of space here at the main facility for primary care services," Bratcher says. "This offers an additional opportunity for space and it offers convenience for veterans moving to the Valley, which is a hotspot." He adds, "We're just fortunate enough that it's also located in close proximity to the vet center, which is an outpatient mental health program that treats combat vets and a variety of other folks." At the main campus in northwest Spokane, parking lot improvements that began in May are expected to be complete in the next four to six weeks in a project that is reorganizing and repurposing some employee and patient parking areas and will include the relocation of an STA transit stop on campus, Arment says. G2 Construction Inc., of Fairbanks, Alaska, is the contractor and Planate Management Group LLC, of Alexandria, Virginia, designed the parking lot improvements. A $14 million elevator replacement project that will update four elevators in the main hospital will follow the completion of the transit relocation project. The design-build team for the elevator replacement project is Spees Design Build, of Burien, Washington, and Elevated Technologies Inc., of Phoenix, says Bowers. The majority of the remaining improvements are part of plans to increase access to health care and the experiences of veterans receiving care through minor equipment replacement and building maintenance projects, Arment says. "In about a year, we're looking at doing another addition to primary care with a new building on the back side of the hospital and another new building on the front side of the hospital for mental health," says Arment. "Those are roughly 10,000 square feet each and are still in the design phase." The new clinic in Spokane Valley was leased from Hamstra-Juliet JV LLC, of Dallas, says Bowers. "It's a sizable project," Arment says. "The best thing about all of this is it expands care for veterans. It's the best possible outcome of all this as we're increasing our footprint at a time when the country is concerned about providing health care, and the VA is doing its part." Mann-Grandstaff also operates two health clinics in Spokane and additional clinics in Coeur d'Alene and Kootenai, Idaho; in Libby, Montana; and in Wenatchee, Washington. Bowers says the capital improvement projects have been planned since 2020. About 30,000 veterans have been enrolled in VA health care in the last 1 1/2 years in Washington state, and the Mann-Grandstaff VA currently sees 45% of veterans in the region it serves. "Our facility is poised to upgrade our infrastructure to meet this expected need of veterans in the community at large ... and ensure our resources are up to par and available to veterans that are moving to the Pacific Northwest," Bowers says. ______________________________________________________________ 668-CSI-008, 36C26024R0020, 21-0011, 21-0544 The purpose of this Amendment (0001) is to issue the attached final solicitation and attachments, which supersedes the draft solicitation issued on www.sam.gov on 13 Feb 2024. As such, offerors are hereby notified to comply with the requirements including deadlines, noted in the attached final solicitation and attachments. Project 668-CSI-008, Expand and Renovate Building 27 for Additional MRI Located at the Mann-Grandstaff VA Medical Center, 4815 N Assembly St, Spokane, WA 99205 Please see attachments in Section J of this solicitation for the full scope of work for this project. Questions must be submitted by 12:00 PST on 4/2/2024 to michael.conway5@va.gov. Any question answered by other than an RFP amendment providing question and answer to all interested parties has no bearing on this RFP. Proposals must be submitted by email to the Contract Specialist, michael.conway5@va.gov, no later than 12:00 PST on 5/6/2024. Proposals submitted by any other means will not be accepted. IAW VAAR 836.204, the magnitude of this construction is between $2,000,000 and $5,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Medical

$5,000,000.00

Public - Federal

Addition, Demolition, Site Work

265

63

170

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
15
Bidding Soon
353
All Active Projects
96
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 6, 2024

May 16, 2024

May 16, 2026

img_map_placeholder

4815 N Assembly St, Spokane, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.