BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Brookfield, Illinois. Design plans call for site work for a playground / park / athletic field.

As of April 24, 2024, per owner a lead designer and architect has been identified. Scope of Services Jaycee Ehlert Park is an approximately 29.4-acre park located on Congress Park and Elm Avenue. The Village is seeking a landscape Architect to oversee the OSLAD Grant project described below. The project will consist of renovating the playground to create a fully inclusive and accessible play environment on pour-in-place rubber surfacing to dramatically enhance accessibility. The large picnic shelter will be renovated, as well, to preserve existing capacity but provide shade comfort seating areas with views and accessible connection to the large playground. Between the new inclusive playground and shelter will be a game table area with outdoor ping pong and chessboard picnic tables to introduce new amenities to the park and Village as a whole. The existing ballfield will be renovated with new fencing, infield mix, and re-graded and newly seeded turf outfield (to improve drainage), with accessible connections to the dugouts and spectator seating areas from the existing park's pathway system. A newly dedicated soccer field area will be established at the northwest corner of Phase III. area. Trail improvements and accessible connections will be provided to all improved areas and to the renovated memorial plaza, which will feature repurposed/upgraded pavers, seating options, and complementary low plant material to enhance the passive space. Green infrastructure will be provided with use of a rain garden adjacent to the playground with native planting, along with landscape improvements consisting of shade and ornamental trees, low grasses, groundcover, and perennials. The proposed improvements will be located to minimize site disturbance and preserve the existing mature tree grove at the northeast corner of Phase III. area. The above schedule may be changed, and the Village is open to the successful firm expediting the services, so that services are completed earlier. The goal is to have project complete by March of 2025. For further information regarding the RFP, please contact Luke Gundersen, Director of Parks and Recreation, at 708-485-1527.

Design

Playgrounds / Parks / Athletic Fields

$1,315,600.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
89
Bidding Soon
1,770
All Active Projects
766
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2025

img_map_placeholder

4338 Congress Park Ave, Brookfield, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.