BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Golden, Colorado. Contact the soliciting agency for additional information.

NREL's Distributed Integrated Energy Lab (DIEL) project at the Flatirons Campus, is creating a grid emulator system that will allow for both Controller Hardware-in-the-Loop (C-HIL) and Power Hardware-in-the-Loop (P-HIL) testing and validation at NREL's Flatirons Campus. DIEL is a research facility interconnecting various multi-kW to MW-scale generation sources (wind, solar, waterpower), loads, and other assets. OBJECTIVE: The grid emulator system will consist of two subsystems that need the following: A 400 kVA rated AC power amplifier system which will be installed in a building at the Flatirons Facility and connected to existing generation assets and the controlled grid interface. A mobile AC power amplifier system rated to 60 kVA which should be relatively easy to move between different test buildings. Written questions concerning this solicitation document and its requirements will be answered in writing. In response to technical questions, NREL will issue an amendment to this solicitation document that will formally provide all the questions and answers. All recipients of the solicitation document will receive responses to questions.

Post-Bid

Laboratories

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
37
Bidding Soon
998
All Active Projects
419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2024

March 8, 2024

img_map_placeholder

15013 Denver W Pkwy, Golden, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.