BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a playground / park / athletic field in Santa Clarita, California. Completed plans call for site work for a playground / park / athletic field.

As of April 4, 2024 project was awarded to R.C. Becker and Son, Inc, awarded amount is $53,877.24. Reference Number 0000338817 This project will provide for the removal and replacement of multi-purpose field 4 at Central Park. The project will remove the existing turf grass surface, lower the grade of the field, incorporate soil amendments, and install large roll hybrid Bermuda grass sod to quickly establish the new surface and improve upon the older varieties of grass currently being used. Clear and grub to remove existing turf grass, weeds and native soil including disposal of all removed material at landfill, to 3" depth (approximately 66,000 SF) Question Deadline 01/30/2024 at 11:00 AM PT Questions are submitted online Yes, Bid Questions should be submitted electronically via online . Contact Information: Danielle Marquez | (661) 255-4936 | dmarquez@santa-clarita.com General Requirements - Certified Payroll - Contractors License Required - Installation Required - Insurance Required - Prevailing Wage Required Required Contractor & Subcontractor Registration: Only bids submitted by bidders (along with all listed subcontractors) that are currently registered and qualified to perform public work pursuant to Labor Code Section 1725.5 will be accepted. Bid bonds shall be furnished by all Bidders in the amount of at least 10% of the total value of the bid the specification (cash deposit, certified or cashier's check, or money order may be substituted in lieu of the bid bond). The successful Bidder will be required to furnish a Labor and Material Bond in an amount equal to one hundred percent (100%) of the Contract price and a Faithful Performance Bond in an amount equal to one hundred percent (100%) of the Contract price. *the City reserves the right to reject any or all bids, to waive any irregularity, and to take the bids under advisement for a period of ninety (90) days, all as may be required to provide for the best interests of the City

Award

Playgrounds / Parks / Athletic Fields

$53,877.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
101
Bidding Soon
2,159
All Active Projects
955
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2024

April 8, 2024

img_map_placeholder

Multiple Locations, Santa Clarita, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.