BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Pueblo, Colorado. Working plans call for the renovation of a educational facility.

The owner has selected a Design Builder. A timeline for construction has not yet been established. Reference Number 0000339389 Delivery Point: Fountain International Magnet School Notice of Award February 28, 2024 (tentative) Question Acceptance Deadline 01/19/2024 04:00 PM MT Questions are submitted online No, Questions concerning this RFP and the procedures for responding to the RFP should be directed in writing, e-mail or fax only, to: Tina Branom, Purchasing Manager Phone:719-253-6404 Fax: 719-253-6406 Pueblo School District 60 E-mail: tina.branom@pueblod60.org 315 W. 11th St. Pueblo, CO 81003. Notice of Award February 28, 2024 (tentative) It is the purpose of this Request for Proposal (RFP) to seek competitive proposals to replace one rooftop unit (RTU) at Fountain International Magnet School, 925 N Glendale Avenue, Pueblo, Colorado, 81001. The successful vendor will be responsible for removing and disposing of the existing RTU, providing the new RTU, and all engineering, design, labor, supervision, materials, equipment, transportation, and services necessary to perform high quality work as further described in the Scope of Work. Bonding Requirements - Performance Bond 100 % - Payment Bond 100 % The District reserves the right to accept or reject any or all proposals. Pueblo School District 60 is seeking competitive proposals for the design, engineering, purchase, delivery, and installation of one new rooftop unit for the gymnasium. The Contractor will also be responsible for the removal and disposal of the existing rooftop unit. 1. Contractors will conduct a pre-bid site visit and gather information for the development of a Work Plan. As part of the Work Plan and construction activities the Contractor will identify and comply with all applicable federal, state and local statutes. The Contractor will also comply with applicable terms and conditions of the contract. 2. The finalized Work Plan and interval construction schedule will be submitted to the Districts Project Manager for review and approval prior to the start of construction. The Project Manager will provide to the Contractor any existing drawings/specifications relating to the project. 3. The Contractor will mobilize construction forces necessary to begin the project within ten (10) business days after approval of the Work Plan and construction schedule by the District. 4. The Contractor will arrange for the following as needed: a. A secure staging area for storing equipment, materials, tools, and supplies, as the Contractor shall have sole liability for said items, and b. Access to and provision of utilities as needed for design and construction. 5. The following documents, plans, and reports will be provided to the Project Manager: a. Work Schedule and short interval schedule to include daily and weekly activities b. As-built drawings at the end of the project c. Hazardous Waste Disposal Certificates as requested or required, and d. Inspection Reports as completed.

Pre-Construction/Negotiated

Educational

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
14
Bidding Soon
206
All Active Projects
86
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2024

September 30, 2024

img_map_placeholder

925 N Glendale Ave, Pueblo, CO

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.