BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Pope, Mississippi. Contact the soliciting agency for additional information.

DESCRIPTION OF WORK ON POPE TOWN STREETS AND PARK Grass and Water Ditch area(Once per month) This includes removal of trash and debris from roadside within cutting area. String trimmers should be used as necessary to touch up after mowing around all signs, bushes, trees and upper outer bank or top of all water or drain ditches. (Not accessible by mowers) Any culverts with ends that appear to be overloaded with debris. The contractor will be expected to make two (2) lawn mower cuts on each side of street(away from street), the two (2)cuts (assuming they are of a standard size mower) stated in inches would be roughly 78" to84". If a bush hog is used the2" to 3.5" cut would have to be followed and the street cleaned afterward. The site will be surveyed before every mowing to first remove items that should not be mowed over, such as bottles, cans and fallen limbs disposing of them. Twice per Month (March-October) Grass cutting and weed eating to be maintained at City Park and Town Hall and keep parking lot of town hall blown off and weeds and limbs maintained. This includes the big bank on Main St. across from City Park near Pear St. Description of work to be performed at Lagoon (once per month) (March Oct.) GRASS will be bush hogge donce monthly beginning March through October. BANKS to be cut once during this time to help eliminate any overgrowth or trees growing on banks. FENCE line needs to be kept clean of vines and growth. The fence can be sprayed with chemicals to maintain. Also, the area outside fenced area of the lagoon a distance of 4 to 5 feet should be maintained. LIFT STATIONS (15) are to be mowed or weed eated monthly. CELLS (3) are to be maintained with all trees, bushes and shrubbery removed. No chemicals should be sprayed around the cells of the lagoon The method of Contractor Selection has not been Determined at this time.

Final Planning

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
27
Bidding Soon
358
All Active Projects
157
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2024

img_map_placeholder

Multiple Locations, Pope, MS

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.