Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 2, 2024 at 8:00 PM
Updated April 3, 2024
Site work and new construction of a municipal facility in Lebanon, Kentucky. Working plans call for the construction of a municipal facility; and for site work for a municipal facility.
**As of April 2, 2024, this project already bid and there are no plans of rebidding at this time** Bids opened for animal shelter, decision tabled By DENIS HOUSE editor@lebanonenterprise.comFeb 21, 2024 Three companies submitted bids for the construction of a new animal shelter https://www.pmg-ky2.com/lebanon/news/bids-opened-for-animal-shelter-decision-tabled/article_74092aba-ccdb-11ee-82ec-fff896275856.html Three companies submitted bids for the construction of a new animal shelter, but the Marion County Fiscal Court voted to table a decision on which bid to accept pending further review as all three bids came in higher than the court anticipated. Marion County Fiscal Court will receive proposals for a construction manager for the Marion County Animal Shelter Building Project. The county will consider any and/all proposals and reserves the right to accept or reject any and/all bids. David Daugherty Marion County Judge Executive Project: 1. Project Location: Marion County Animal Shelter, 1105 State Highway 208, Lebanon, KY 40033 2. Owner: Marion County B. Contract Documents were prepared for the Project by VBNA, Inc. and their consultants. C. This project consists of the construction of a new animal shelter to replace the existing shelter on the same property. Exterior walls and structural are a pre-engineered building type. Windows are aluminum storefront units. Roof structure consists of steel purlins and metal roof. Floors are slab-on-grade. Interior walls are metal studs with g.w.b. Wall finishes are paint. Ceilings are exposed insulation and gypsum wallboard. Site work includes limited grading, new sidewalk, paving and site utilities. The Work will be constructed under a single prime contract.
Final Planning
Municipal
$625,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 15, 2024
September 13, 2024
1105 State Hwy 208, Lebanon, KY
Related To This Project
Lebanon, KY
Bid Date: Feb 20 2024
Lebanon, KY
Bid Date: Feb 20 2024
Lebanon, KY
Bid Date: Feb 20 2024
Lebanon, KY
Bid Date: Feb 20 2024
Lebanon, KY
Bid Date: Mar 06 2024
Lebanon, KY
Bid Date: Apr 08 2024
Lebanon, KY
Bid Date: Apr 05 2024
Lebanon, KY
Bid Date: Apr 04 2024
Lebanon, KY
Bid Date: Nov 16 2023
Construction of Water System Improvements Contract 5 - Water Treatment Plant Modifications - 3693527
Lebanon, KY
Bid Date: May 30 2019
Lebanon, KY
Bid Date: Feb 24 2022
Lebanon, KY
Bid Date: Feb 24 2022
Lebanon, KY
Bid Date: Sep 20 2023
Lebanon, KY
Bid Date: Aug 04 2023
Lebanon, KY
Bid Date: Jul 28 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
