BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2024 at 8:00 PM

Updated April 3, 2024

Site work and new construction of a municipal facility in Lebanon, Kentucky. Working plans call for the construction of a municipal facility; and for site work for a municipal facility.

**As of April 2, 2024, this project already bid and there are no plans of rebidding at this time** Bids opened for animal shelter, decision tabled By DENIS HOUSE editor@lebanonenterprise.comFeb 21, 2024 Three companies submitted bids for the construction of a new animal shelter https://www.pmg-ky2.com/lebanon/news/bids-opened-for-animal-shelter-decision-tabled/article_74092aba-ccdb-11ee-82ec-fff896275856.html Three companies submitted bids for the construction of a new animal shelter, but the Marion County Fiscal Court voted to table a decision on which bid to accept pending further review as all three bids came in higher than the court anticipated. Marion County Fiscal Court will receive proposals for a construction manager for the Marion County Animal Shelter Building Project. The county will consider any and/all proposals and reserves the right to accept or reject any and/all bids. David Daugherty Marion County Judge Executive Project: 1. Project Location: Marion County Animal Shelter, 1105 State Highway 208, Lebanon, KY 40033 2. Owner: Marion County B. Contract Documents were prepared for the Project by VBNA, Inc. and their consultants. C. This project consists of the construction of a new animal shelter to replace the existing shelter on the same property. Exterior walls and structural are a pre-engineered building type. Windows are aluminum storefront units. Roof structure consists of steel purlins and metal roof. Floors are slab-on-grade. Interior walls are metal studs with g.w.b. Wall finishes are paint. Ceilings are exposed insulation and gypsum wallboard. Site work includes limited grading, new sidewalk, paving and site utilities. The Work will be constructed under a single prime contract.

Final Planning

Municipal

$625,000.00

Public - County

New Construction, Site Work

29

22

12

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
73
Bidding Soon
1,087
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

September 13, 2024

Project location map

1105 State Hwy 208, Lebanon, KY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.