Renovation of a fire / police facility in Santa Ana, California. Completed plans call for the renovation of a fire / police facility.

Online Q&A Yes Q&A Deadline 01/23/2024 2:00 PM (PST) All Questions must be submitted in writing on PB Q&A Fire Station 75 is operated by Orange County Fire Authority (OCFA) through the City of Santa Ana, located at120 W Walnut St, Santa Ana, CA 92701. HARD COPIES FOR VERIFICATION ONLY; ELECTRONIC SUBMITTAL IS REQUIRED BY DEADLINE AND HARD COPIES MAY BE ACCEPTED BY COB OR NEXT BUSINESS DAY. Please send the original bid bond, as well as the notarized affidavits, enclosed in a sealed envelope and marked clearly with following information, formatted exactly as below: "SEALED BID BOND FOR PROJECT NO. 22-6020 OCFA Fire Station 75 Fuel System Replacement City of Santa Ana Attn.: Michael Ortiz Public Works Agency; M-36 20 Civic Center Plaza; Ross Annex 3rd Floor Santa Ana, CA 92701" For hard copy drop offs, visitors will be routed to deliver in the grey drop box on the 1st floor of Ross Annex across from the Public Works counter. Gentle note: staff will not timestamp or sign any hard copy deliveries as the electronic submittal by the deadline is suffice. Install 1 2000-gallon diesel fuel aboveground storage tank on engineered reinforces concrete slab, install one new dispenser, design and construct new canopy, and install new def. tank and dispensing system. Remove the existing 4000-gallon diesel/gasoline fuel underground storage tank and corresponding dispensers, Contractor to provide and install temporary construction fencing and barricades to isolate the construction area from on-site vehicle traffic and protect personnel and the public, protect trench areas with fencing and installsteel plates over piping trenches during non-working hours or when no work is in progress, saw-cut yard concrete pavement for UST removal and dispose of all concrete, rebar, and other debris, provide all tank-cleaning tasks, Install pre-engineered shoring systems, excavate UST backfill materials to UST spring line. Stockpile and cover with plastic sheeting, provide waste manifest, perform all soil sampling tasks, analysis, and closure reports

Award

Fire / Police

$584,667.00

Public - City

Renovation

20

9

6

9

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
111
Bidding Soon
2,391
All Active Projects
1,068
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2024

April 30, 2024

img_map_placeholder

120 W Walnut St, Santa Ana, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.