Demolition and site work for a recreation facility in Middle Township, New Jersey. Completed plans call for the demolition of a recreation facility; and for site work for a recreation facility.

Demolition and Site Clearing of Former Aviary Habitat at the Cape May County Zoo Question Deadline 01/19/2024 at 2:00 PM ET Questions regarding these specifications must be directed in writing to Allison L. Hansen via email at allison.hansen@co.cape-may.nj.us. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. 1. Demolition: a. Complete demolition and removal of all structures, contents, foundations, piping, mechanical and electrical equipment, furnace, split rail fencing and underground utilities (water, wastewater, electrical, etc.). b. Complete demolition and removal of all above and below ground structures; including, but not limited to trees/stumps, concrete slabs and curbs, and landscaping. c. Trees, if any, to remain will be clearly marked as such. All trees and their stumps are to be removed-extracted from the soil, NOT ground/shredded in place, holes filled with topsoil, graded level, and grass seeded. d. All material, equipment, rubble, debris, and other products of the demolition shall become the property of the Contractor for their disposal off-site in accordance with all applicable laws and ordinances. Any sale of salvageable materials by the Contractor shall only be conducted off-site. e. The Contractor is responsible for determining the extent of the work required and to verify the accuracy of the property/demolition site. f. The Contractor shall fill and compact all voids left by the removal of trees, stumps, pipes, structures, etc.with clean material and a grade consistentwith the surrounding area. g. Access to the site is from 7:00 a.m. to 4:00 p.m. seven days a week. Contractor is responsible for complying with an existing local noise/disturbance regulation(s). h. Any hazardous materials encountered during demolition must be disposed of in accordance with applicable regulations at the appropriate facility. Notify the Director of Park immediately or as soon as practicable thereafter if hazardous material(s) are found. No asbestos is suspected. 2. Site Clearing: a. All trees and their stumps are to be removed-extracted from the soil, NOT ground/shredded in place, voids filled with topsoil, graded level and local variety perennial grass seeded. b. Landscaping removal - all landscaping on the properties is to be removed. c. Fencing removal - all fencing on the properties is to be removed. d. Concrete Flooring in building must be removed. e. Voids must be compacted, filled, and graded level with a minimum of 2 inches thick topsoil applied to the disturbed areas, and seeded with a local variety perennial grass. f. Final grade must be approved by the Director of Park. g. The County will not provide dumpsters for material removal. 3. Pollution Control: a. Contractor will surround the work area with a temporary fence to prevent unwanted intrusion. Atthe end of the workday the contractor will ensure the equipment access location of the temporary fence is closed. b. Any and all equipment, trucks, dumpsters, material, and incidentals to be used to complete the work will be in good working order without leaks and shall be removed promptly after the completion of the work. c. Alltransport of debris must be fully enclosed/covered from point of origin to disposal facility. d. For dust mitigation, the Contractor must use water and other suitable methods as necessary to limit the amount of air pollution emitted as practical for the conditions of work. e. After demolition, the Director of the Park will determine if adjacent structures require the Contractor to provide cleaning to remove dust and debris caused by demolition operations prior to final acceptance.

Award

Amusement and Recreation

$64,400.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
322
Active Projects
177
Bidding Soon
2,272
All Active Projects
986
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 14, 2024

March 15, 2024

img_map_placeholder

707 US-9, Middle Township, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.