BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 9, 2024 at 7:00 PM

Updated February 10, 2024

Renovation of a transportation facility in Grand Haven, Michigan. Completed plans call for the renovation of a transportation facility.

The City of Grand Haven is soliciting local painting service companies to provide bids for the City of Grand Haven Airport Hangar A roof coating. Project is to include the supplying of all materials, tools, and labor. The contractor will be responsible for examining the current roof surfaces to ensure that the proposed coating will adhere properly in order to meet the manufacturers warranty requirements. The Contractor will be responsible for surface preparation and repairs of the areas as identified. Furnish all materials and labor as outlined in the scope of work to the manufactures specifications. Hangar A consists of two buildings, approximately 13,500 sq ft total. The Contractor is required to separate the bid amounts per building and city staff will determine if none, one, or both buildings will be completed. Any questions regarding this RFP or the minimum specifications shall be directed to Doug Lang, Facilities and Grounds Manager, at 616-847-3493. The City of Grand Haven reserves the right to reject any or all bids or any parts of the same, to waive any irregularities and to accept any bid in its own best interest. Scope of work includes surface preparation, priming, painting, and top coating of floor, walls, doors, ceiling(optional), trims, and any other miscellaneous areas and details comprising the interior of hangar and work room. For clarity the Contractor shall break these areas and/or surfaces into individual quotations or costed out items. 1.1.1 Floors a. Main hangar floor ~ 3600 sq. ft. (concrete floor) b. Workroom floor ~ 400 sq. ft. (concrete floor) 1.1.2 Walls a. Main Hangar (3) walls ~ 2,500 sq. ft. (mainly metal) b. Front of hangar (doors and frame) ~840 sq. ft. - mainly frame needs painting and some insulation repair. c. East workroom wall (wood) d. Misc. doors, small areas/walls, trims 1.1.3 Ceiling (optional) a. Main hangar ceiling ~3600 sq. ft. (metal) optional b. Patch roof (SW corner) vent hole & cover vent before paint 1.1.4 Work benches a. Main Hangar- wood b. Workroom- wood 1.2 All work, including disposal, shall be performed in accordance with all applicable local, state and federal regulations. In addition, any safety precautions shall be observed by the Contractor. 1.3 The quotation/bid shall include a detailed scope of work as proposed and particular preparation details, application details, and paint details for the surfaces/items being bid/quoted on.

Post-Bid

Transportation Terminals

$100,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
73
Bidding Soon
898
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2024

March 8, 2024

Project location map

16446 Comstock St, Grand Haven, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.