Site work and paving for a civil project in Wheaton, North Dakota. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
The Project includes the following Work: meandering channel and floodway excavation, construction of earthen embankment, installing side inlet culverts, box culverts, sheet piling, seeding and other miscellaneous items. Prevailing Wage Rules apply per Minn. Stat. 177.41 through 177.44. Question Deadline 03/08/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Brett Bailly, telephone: 701.282.4692, brett.bailly@mooreengineeringinc.com, only questions made in writing by an attachment (PDF) to email or mail may be considered for response by Addenda. Questions received less than seven days prior to the date for opening of Bids may not be answered. Select ONLY one of the next two paragraphs as appropriate for the specific project. All Bids shall be accompanied with a signed statement under oath by the Bidders owner or officer verifying compliance with Minn. Stat. 16C.285 meeting the Responsible Contractor requirements. Also included will be a list of all of its first-tier subcontractors that it intends to retain for work on the project. 1. Any prime contractor or subcontractor that does not meet the minimum criteria established for a responsible contractor as defined by Minn. Stat. 16C.285, Subd. 3, or fails to verify that it meets those criteria, is not a Responsible Contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project. 2.A false statement under oath verifying compliance with any of the minimum criteria shall make the prime contractor or subcontractor that makes the false statement ineligible to be awarded a construction project and may result in termination of a contract awarded to a prime contractor or subcontractor that submits a false statement. 3. A prime contractor shall submit to the contracting authority, upon request, copies of the signed verifications of compliance from all subcontractors. Use the following for North Dakota Projects ONLY. The Bois de Sioux Watershed District reserves the right to hold all bids for a period of 60 days after the date of the bid opening, to reject any or all bids, and to waive any irregularities. Bid security shall be furnished in accordance with the Instructions to Bidders. Bid results:- Option A John Riley Construction, Inc. $9,469,652.50 Option B John Riley Construction, Inc. $9,469,652.50
Bid Results
Bridges / Tunnels
$18,939,305.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 15, 2024
April 15, 2024
Multiple Locations, Wheaton, ND
Related To This Project
West Fargo, ND
Bid Date: Jan 25 2024
Grand Forks, ND
Bid Date: Feb 01 2024
Bismarck, ND
--
Mayville, ND
Bid Date: Feb 02 2024
Fargo, ND
Bid Date: Feb 08 2024
Bowbells, ND
Bid Date: Feb 02 2024
Fargo, ND
Bid Date: Jan 25 2024
Minot, ND
Bid Date: Jan 30 2024
Bottineau, ND
Bid Date: Feb 06 2024
Bottineau, ND
Bid Date: Feb 06 2024
MREFPP (Mouse River Enhanced Flood Protection Project ) MI-7A Roosevelt Park Tree Clearing - 5271895
Minot, ND
Bid Date: Jan 30 2024
Minot, ND
Bid Date: Jan 31 2024
West Fargo, ND
Bid Date: Jan 25 2024
Bismarck, ND
Bid Date: Jan 30 2024
Bismarck, ND
Bid Date: Jan 30 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.