Site work for a water / sewer project in Malta, Ohio. Completed plans call for site work for a water / sewer project.
Water System Improvements The Project work shall consist of furnishing all labor, materials, and equipment in accordance with the contract documents. Project cost estimate is $2,028,983.00 Each bid shall be accompanied by a Bid Guaranty and Contract Bond as required of the Ohio Revised Code in an amount equal to the sum of the bid submitted by each contractor. In lieu of posting the bond, a bidder may use a Cashier's Check, Certified Check or Letter of Credit for ten percent of the Contractor's bid as bid security. When a check or letter of credit is used, the bidder shall be required to post a 100 percent Performance Bond and a 100 percent Labor and Material Payment Bond, upon the signing of the contract. The Owner reserves the right to reject any and all bids, and the right to accept the lowest and best bid, the right to waiver minor irregularities on any bid, and the right to accept the bid proposal which promotes the best interest of the Owner. Proposals may be withdrawn at any time before the scheduled closing time for receipt of bids but may not be modified and resubmitted. No proposal or bid security may be withdrawn or modified after the scheduled closing time for submission of proposals for at least sixty (60) days, except as provided in Section 9.31 of the Ohio Revised Code. Proposals may be held by the Owner for a period not to exceed sixty (60) days from the date of bid opening for the purpose of reviewing the proposals and investigating the qualifications of Bidders prior to the Award of the Contract, unless an extension is made pursuant to Section 153.12 of the Ohio Revised Code. The Owner reserves the unqualified right to reject any or all proposals received. Blank spaces in the Proposal must be properly filled in and the phraseology of the Proposal must not be changed. Additions, qualifications or limitations must not be made to the items mentioned therein and any unauthorized conditions, limitations or provisions attached to a Proposal will be liable to render it informal and may cause its rejection. The right is reserved to waive informalities, irregularities, and technical defects of a non-material nature, as the interest of the Owner may require. After the proposals are opened and read aloud, they will be compared on the basis of the Bidder's Total Base Bid, which is the summation of the products of the approximate quantities shown in the proposal by the total (sum of labor and material) price of all standard items. The Bidder's Total Base Bid shall be the summation of only the standard bid items. Project Completion Substantial Completion date for the contract shall be 270 days from date of Notice to Proceed. Final Completion date for the contract shall be 300 days from date of Notice to Proceed.
Bid Results
Water / Sewer
$1,897,250.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 09 - Finishes
Division 10 - Specialties
Division 12 - Furnishings
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 1, 2024
March 1, 2024
Multiple Locations, Malta, OH
Related To This Project
Malta, OH
--
Malta, OH
Bid Date: May 09 2024
Malta, OH
Bid Date: Oct 28 2021
Malta, OH
Bid Date: Dec 09 2020
Malta, OH
Bid Date: Oct 24 2019
Malta, OH
Bid Date: Jan 31 2025
Malta, OH
Bid Date: Mar 25 2022
Malta, OH
Bid Date: Jan 13 2022
Malta, OH
Bid Date: Mar 21 2024
Malta, OH
Bid Date: Jul 11 2024
Malta, OH
Bid Date: Jun 29 2022
Centerville, OH
Bid Date: Jan 25 2024
Akron, OH
Bid Date: Jan 25 2024
Shelby, OH
Bid Date: Jan 26 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.