BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 26, 2024 at 8:00 PM

Updated April 27, 2024

Site work for a water / sewer project in Madison, Wisconsin. Completed plans call for site work for a water / sewer project.

The Dane County Department of Waste & Renewables is soliciting bids for the construction of the Phase 10, Cell 3 liner system at Dane County Landfill No 2 (Rodefeld). Phase 10, Cell 3 liner is an overlay system (overlaps onto the final cover of the existing landfill) of approximately 8.9 acres. The project generally consists of removing existing cover soils, installing geotextile and granular drainage aggregate, modifying existing landfill gas collection infrastructure, and constructing stormwater control infrastructure. Question Submission Deadline: February 9, 2024, 2:30pm

Award

Water / Sewer

$1,869,799.00

Public - County

Site Work

14

16

7

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
272
Active Projects
160
Bidding Soon
1,729
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

April 1, 2024

Project location map

To Be Determined, Madison, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.