Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 21, 2024 at 7:00 PM

Updated June 25, 2024

Site work and new construction of a service station / car wash facility in Marble Falls, Texas. Completed plans call for the construction of a service station / car wash facility; and for site work for a service station / car wash facility.

Furnishing all equipment, labor, and materials and performing all operations required for the construction of WMF Fueling Station located on the Wirtz Dam Road. Contractor shall perform the following 1. Perform site visit to ensure location, layout and site staging areas. 2. Procure all materials required. 3. Construct and build to in accordance with stamped construction design prints. 4. Provide schedule updates at least bi-monthly to LCRA project management. 5. Above ground fuel tank (double-walled, with compartments for fuel types) a. Fuel Types to be - Gasoline, Diesel and DEF. 6. Fueling station will be canopy style-similar to LCRA's DSC facility - Pictures below. 7. Install all necessary software Fuel management unit and veeder-root a. Software systems will be ready for live operations at project completion. b. Include Software component in QA/QC plan. 8. The fuel management unit will need to be setup and integrated as a new facility location with LCRA's existing cloud-based fuel management system(FMlive). This system will be LTE connected and cloud-based providing remote access and functionality for various tasks such as adding users and vehicles, accessing reports, checking tank levels (including diesel, unleaded, and DEF), and receiving alarm notifications. The Lower Colorado River Authority (LCRA) is soliciting proposals from qualified, eligible vendors to be responsible for furnishing all equipment, labor, and materials and performing all operations required for the construction of WMF Fueling Station located on the Wirtz Dam Road. Question Deadline Monday, February 12, 2024 12:00 AM CT

Post-Bid

Service Station / Car Wash

$850,000.00

Public - City

New Construction, Site Work

33

5

5

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
275
Active Projects
96
Bidding Soon
2,489
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2024

March 20, 2024

Project location map

Wirtz Dam Rd, Marble Falls, TX

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed