BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 8, 2024 at 8:00 PM

Updated April 9, 2024

Site work and paving for a mixed-use development in Royal Oak, Michigan. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As of April 8, 2024 project was awarded to Mark Anthony Contracting Inc, awarded amount is $1,209,925.29. Reference Number 0000339455 2024 Green Infrastructure Improvements 8" ductile iron water main and water services installation Removal of composite and concrete pavement Concrete paving with integral curb Concrete driveway/sidewalk construction Earth excavation and grading Drainage structures and piping Rain garden soil mix, plantings and bark mulch Topsoil and seed/sod restoration Question Deadline 02/05/2024 at 1:00 PM ET Questions are submitted online No Each proposal must be accompanied by a certified check or bid bond by a recognized surety company in the amount of five percent (5%) of the total bid amount, payable to the City of Royal Oak as security for the acceptance of the Contract. No bidder may withdraw his proposal between the date set for the opening thereof and the date upon which the Contract is awarded. *The city reserves the right to reject any or all proposals and the right to waive defects in proposals

Award

Playgrounds / Parks / Athletic Fields

$1,209,925.00

Public - City

Paving, Site Work

19

5

5

Subscribe For Documents

145 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
321
Active Projects
124
Bidding Soon
2,560
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2024

April 15, 2024

Project location map

Multiple Locations, Royal Oak, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.