BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2024 at 8:00 PM

Updated August 22, 2024

Site work for a bridge / tunnel in Midland, Michigan. Completed plans call for site work for a bridge / tunnel.

As of April 11, 2024, this project has yet been awarded. A timeline for award has yet been established. Reference Number 0000339459 This project is for culvert repairs and drain rehabilitation near the intersection of the Meadowbrook Drain (also known as the Rockwell Drain) and Crescent Drive. The scope includes culvert debris removal, concrete pipe and joint repairs, tree removal, clearing & grubbing, earthwork, channel reshaping and bank stabilization as per the project plans and specifications attached herein. Contractor shall work exclusively within the Meadowbrook Drain right of way and the temporary easement limits, as described in the temporary grading easement exhibits, attached herein. Construction shall begin prior to March 19, 2024, unless otherwise approved by the Engineer. Construction shall be completed no later than August 2, 2024. Once construction begins, the Contractor shall complete the project within 40 consecutive calendar days. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % A certified check or bid bond for a sum of less than five percent (5%) of the amount of the Proposal will be required with each bid. The City reserves the right to accept or reject any or all bids, to waive irregularities or defects, and may accept other than the low bid when deemed in the City's best interest

Award

Bridges / Tunnels

$335,420.00

Public - City

Site Work

5

7

2

5

Subscribe For Documents

108 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
0
Bidding Soon
929
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2024

August 5, 2024

Project location map

W Meadowbrook Dr, Midland, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.