BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Mount Sterling, Kentucky. Conceptual plans call for site work for a water / sewer project.

The Reid Village Water District is applying for federal funding for the Devonne Pump Station Pump Replacement and Meter Replacement Project. Engineering services may include, but are not limited to: feasibility study, preliminary engineering/architectural report, cost estimate preparation, planning, design, construction administration, inspection, other required engineering services, and administration. All engineers interested in being considered for this project must submit a proposal detailing qualifications, technical expertise, management and staff capabilities, and related prior experience related to water distribution, water transmission, water storage, and water treatment. The objective of the competitive processisto objectively select the firm that will provide the highest quality of service. Selected respondents may be interviewed and the firm(s) judged most qualified will be asked to prepare a final proposal which would include fees for said services. Reid Village Water District reserves the right to reject any and all responses, to waive any technicalities, and to negotiate with the respondent who most nearly meets the project requirements. Reid Village Water District is not responsible or liable for any costs incurred by the consultants replying to this request. Reid Village Water District is an equal opportunity employer and encourages responses from all qualified firms. Kentucky Relay Service for the hearing and speech impaired: 1.800.648.6056. Anticipated funding sources for this project include, but are not limited to: KIA Cleaner Water Grant Funding. All work to be undertaken as part of this proposed program must be undertaken in accordance with 24 CFR, Part 570; 24 CFR, Part 58; and other applicable State and Federal requirements. Contact Benjamin Hamm at 606.780.0090, ext. 2210 or email benjamin.hamm@ky.gov for additional information and/or questions

Conceptual

Water / Sewer

$142,224.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
55
Bidding Soon
709
All Active Projects
272
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2024

img_map_placeholder

To Be Determined, Mount Sterling, KY

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.