Demolition, site work and addition to an educational facility in Suquamish, Washington. Completed plans call for the addition of a 4,200-square-foot educational facility; for the demolition of a educational facility; and for site work for a educational facility.

https://www.kitsapdailynews.com/news/contract-approved-for-suquamish-elementary-gym-addition/ Contract approved for Suquamish Elementary gym addition The North Kitsap School District board of directors approved a roughly $3.3 million contract to Poulsbo-based Pacific General Builders for the Suquamish Elementary gym addition at its March 21 meeting. The project will provide a new gym for physical education classes at the elementary school, documents state. PE classes now take place in a shared space used as a cafeteria and auditorium. “This configuration has limited student schedule access to both physical education, and meal space,” per documents. The project will consist of construction of a 4,200-square-foot gym with two restrooms, an office, storage, a fire suppression riser room and a mechanical mezzanine, documents read. There will be a corridor with storage on each side connecting the new gym to the existing building. The project also includes upgrades such as relocation of a fire hydrant located in the middle of the bus loop, new asphalt paving of the bus loop, new curbs and sidewalks, ADA access, and storm and sewer improvements. The project will be funded by proceeds from the voter-approved 2022 capital levy. With the addition of a new gym, Suquamish will join three other elementary schools—Vinland, Gordon and Poulsbo—that have a dedicated space for PE, as well as a multi-purpose space for food service, meetings, assemblies and special events. The project is expected to be completed in the fall. ______________________________________ Suquamish Elementary Gymnasium Addition Project Location: 18950 Park Ave NE, Suquamish, WA 98392 Scope of Work: The proposed project is an approximately 4200 sf gymnasium with two bathrooms, an office, fire riser room, mechanical mezzanine and storage. Construction scope in existing building is limited to the connection to the new addition, and minimal scope in the existing gymnasium. The Project is more thoroughly described in the Specifications, Bidding Documents, and Contract Documents. The bids will include all Work pursuant to the Drawings, Specifications, and Addenda as may be issued prior to bid opening date. Contractor will have 155 calendar days to complete construction, calculated from Notice to Proceed anticipated on Friday, March 15, 2024, through Substantial Completion on Friday, August 16, 2024. Owner reserves the right to postpone the bid opening by Addenda. This Project is subject to Washington State prevailing wages rates. Bid Security must accompany each bid in accordance with the Instructions to Bidders. All questions must be submitted in writing to Bassetti Architects via email no later than ten (10) days prior to the receipt of Bids. Substitution Requests: Architect will consider requests for substitution received no later than ten (10) days prior to receipt of Bids. Requests received after that time may be considered or rejected at the discretion of the Architect. Questions and Substitution Requests shall be submitted via email to: NKSDSuquamish@bassettiarch.com Document Info : Email: Tacoma.bidservices@e-arc.com *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimated Construction Cost: $2,400,000 - $2,800,000 The proposed project is an approximately 4200 sf gymnasium with two bathrooms, an office, fire riser room, mechanical mezzanine and storage. Construction scope in existing building is limited to the connection to the new addition, and minimal scope in the existing gymnasium. The Project is more thoroughly described in the Specifications, Bidding Documents, and Contract Documents. The bids will include all Work pursuant to the Drawings, Specifications, and Addenda as may be issued prior to bid opening date. Construction scope in existing building is limited to the connection to the new addition, and minimal scope in the existing gymnasium. The Project is more thoroughly described in the Specifications, Bidding Documents, and Contract Documents. The bids will include all Work pursuant to the Drawings, Specifications, and Addenda as may be issued prior to bid opening date.

Post-Bid

Educational

$2,800,000.00

Public - County

Addition, Demolition, Site Work

113

27

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
34
Bidding Soon
899
All Active Projects
372
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

March 15, 2024

img_map_placeholder

18950 Park Blvd NE, Suquamish, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.