Published September 23, 2025 at 8:00 PM
Updated September 24, 2025
Site work for a water / sewer project in Charleston, South Carolina. Completed plans call for site work for a water / sewer project.
Maintenance dredging of approximately 3,248,500 cubic yards of unclassified material will be performed across multiple locations in Charleston and Berkeley Counties, South Carolina. The base dredging quantity is 3,016,000 cubic yards. The dredging areas include Charleston Lower Harbor, Charleston Upper Harbor, Joint Base Charleston, TC Dock (optional), and USCG Pier Papa (optional). Material from Charleston Lower Harbor Shoals will be placed in the Daniel Island Placement Area - Middle Cell. Material from Charleston Upper Harbor Shoals will be placed in the Clouter Creek Placement Area, with approximately 500,000 cubic yards going to the North Cell and the remainder, including material from Pier P, to the South Cell. Material from Joint Base Charleston Channel, including TC Dock, will be placed in the Joint Base Charleston Placement Area. The contractor must comply with the Endangered Species Act and the Marine Mammals Protection Act. The project includes mobilization and demobilization, dredging work, provision of a utility vehicle for government use, and compliance with environmental regulations. The estimated magnitude of work is between $10,000,000 and $25,000,000. The contract is a 100% small business set-aside under NAICS code 237900, with a small business size standard of $37 million. The contractor must be registered in SAM.gov. Location: Charleston Upper Harbor, Joint Base Charleston, TC Dock, and USCG Pier Papa Charleston and Berkeley Counties, South Carolina Daniel Island Placement Area - Middle Cell: 235 Seven Farms Drive, Charleston, SC 29492 Clouter Creek Placement Area - North & South Cells: Near 1041 Clouter Creek Drive, Charleston, SC 29405 Joint Base Charleston Placement Area: 104 East Hill Blvd, Joint Base Charleston, SC 29404 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. ANY QUESTIONS OR NEED ASSISTANCE, CONTACT CONTRACT SPECIALIST EVE HALLIBURTON, EVELYN.I.HALLIBURTON@USACE.ARMY.MIL.
Award
Water / Sewer
$14,448,605.00
Public - Federal
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 15, 2025
November 14, 2025
Multiple Locations, Charleston, SC
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.