BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Charleston, South Carolina. Working plans call for site work for a water / sewer project.

PURPOSE OF THIS ANNOUNCEMENT: This announcement constitutes a pre-solicitation announcement of a proposed contract action pursuant to FAR 5.204. This is not a solicitation. No response is requested at this time. A formal solicitation will follow this announcement with full details, including a response deadline, the complete price proposal schedule, the construction plans & specifications, instructions to offerors, and the evaluation factors/basis for award. OFFERORS ARE RESPONSIBLE FOR MONITORING THIS WEBSITE FOR CHANGES TO THIS NOTICE AND THE FORMAL SOLICITATION ANNOUNCEMENT. PLANNED SOLICITATION: The final Solicitation for this project will be announced anytime between 15 and 30 days after the posting of this pre-solicitation. The contract type will be firm-fixed-price DESCRIPTION OF WORK: The work consists of maintenance dredging approximately 3,241,000 (BASE 1,167,000) cubic yards of unclassified material from Charleston Upper Harbor, Joint Base Charleston, TC Dock, MARADS Piers S,T,U and USCG Pier P, Charleston and Berkeley Counties, South Carolina. Material dredged from Charleston Upper Harbor, MARADS Piers S, T, & U, and USCG Pier P shall be placed in the Clouter Creek Placement Area - South Cell. Material Dredged from Joint Base Charleston Channel shall be placed in the Joint Base Charleston Placement Area. Material Dredged from TC Dock shall be placed in the Clouter Creek Placement Area - South Cell or Joint Base Charleston Placement Area. The work includes complying with the requirements of the Endangered Species Act and the Marine Mammals Protection Act. MAGNITUDE OF WORK: ESTIMATED BETWEEN $10,000,000 to $25,000,000 This contract will be solicited as a Total Small Business Set-Aside. The contractor must be registered in WWW.SAM.GOV prior to award of the solicitation. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Water / Sewer

$25,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
56
Bidding Soon
532
All Active Projects
246
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

img_map_placeholder

Multiple Locations, Charleston, SC

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.