BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Franklin, Virginia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project is part of Phase I of the Laurel Street Neighborhood Revitalization Project. Work includes the construction specifications as shown on the Work Write Up for the properties located at 554 and 566 Laurel Street. Bids may not be withdrawn for a period of sixty (60) calendar days after the opening of bids unless the bid is substantially lower than the other bids because of a clerical error as defined in Virginia Code 2.2-4330. Pursuant to Virginia Code 2.2-4330 (B)(1), the bidder shall give notice in writing and shall submit the original work papers with such notice to the City of its claim of right to withdraw the bid within two (2) business days after the opening of bids. The City expressly reserves the right to cancel this IFB and/or reject any or all bids, to waive any informality or irregularity in the bids received, and to accept a bid which is deemed to be in the best interest of the City The work description, SERCAP master specifications and drawings provided will be used together as one document. Disclosure on one will be as being disclosed on all. The Work Write-Up constitutes the basis for each job. Items in the write-up are cross-referenced to the Master Specifications which details methods of application and standards for materials. The drawings or floor plans are diagrammatic only. They serve to illustrate the general location of rooms and the intention of the scope of work. They do not always show all of the work required; exact dimensions or constuction details.These documents can be revised first by addenda before construction and then by change order once construction has commenced. Contractor should review the Work Write-up, master specification and plans for total project scope and alert the rehab specialist of any discrepancies between those documents. Contractor will be supplied a copy of the master specification. Remove all construction debris from the work site to an approved off site disposal area. It is the contractors responsibility to maintain a safe construction site during the building process. The contractor will post a AUTHORIZED ENTRY ONLY-CONSTRUCTION HAZARDS or similar signage during all phases of construction. The contractor is responsible for identifying any site conditions that affect the completion of the project in accordance with plans and specifications. Change orders are required for schedule delays or structural changes. Submit to the Rehab Specialist a written request for approval prior to any work being done. The contractor must have a fully executed change order with all signatures in place before starting work. SITE WORK a The contractor shall verify property boundaries, existing utilities, and easements prior to the commencement of work. b Maintain a safety first construction site during all phases of construction. c Contractor shall comply with all Erosion and Sediment Control Regulations. d A copy of the survey or county GIS map is attached and made a part of the work write-up. e Downspout drainage option 1: Provide and install four 50ft. plastic drain pipes attached to four downspouts, buried and directing water away from the house. Downspout drainage option 2: Provide and install splash blocks at downspouts in lieu of plastic drain pipes if grade and site conditions allow water to drain away from the foundation. f Provide equipment, labor, and material to fine grade, seed, and straw all disturbed lawn areas prior to completion. Once the lawn is established the homeowner should be able to mow grass at 3" without hitting any objects. Maintain a positive slope so water runs away from the foundation. The contractor will provide all material and labor to rehab existing 3 bedroom, 1400sf home. The rehab will include, new roof, window replacement, vinyl siding installation, kitchen and bath room renovations, HVAC repair or upgrade, floor repair and other repairs around the home. Bid Result - 554 Laurel St. - Haley's Roofing & Construction - 89,500.55 566 Laurel St. - Haley's Roofing & Construction - 77,018.00

Bid Results

Roads / Highways

$166,519.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
45
Bidding Soon
781
All Active Projects
310
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2024

April 1, 2024

img_map_placeholder

Multiple Locations, Franklin, VA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.