BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Boulder, Colorado. Completed plans call for the renovation of a 132,550-square-foot residential development.

Introduction: The University of Colorado Boulder will release an RFP in February 2024 for the renovation of Farrand Residence Hall (Farrand). The project will be delivered through a Design-Build GMP contract. Please reference State of Colorado contract documents SC9.0 and SC9.1 found at website. Process: University of Colorado Boulder intends to select a Design-Build Entity who will design, manage and construct the projects as described within. The process to be used in the selection of the firm is comprised of two steps: STEP I: Submittal of Prequalification STEP II: Oral Interviews/Cost Proposal - from shortlisted firms only The shortlisted Design-Build entity with the best combination of qualifications and cost in the final ranking will be considered for contract award. Project specific designs are not required at the RFP stage. Minimum Qualifications, Owner Project Requirements, Anticipated Cost, Scope of Services, Scoring Weights, and Schedule will be provided in the RFP. The intent of the RFP is to award the Farrand Renovation project to one Design-Build entity. Initial Description of Project (subject to clarification in RFP): University of Colorado Boulder is proposing an extensive, comprehensive renovation of Farrand, located in the heart of Main Campus. The building architecture (circa 1948) is integral to the charm of the campus core character. The proposed project will renovate the interior of 132,550 GSF (~80,540 ASF) building. Scope will modernize residence rooms (~400 beds) and academic space, renovate commercial kitchen and dining spaces, add all user-public restroom and outside-the-unit community space. Project will repair the building exterior, replace doors and windows, upgrade the building envelope, and improve site to meet required ADA accessibility codes. Includes selective/systems demolition and abatement, replacement of building systems, install cooling, install air handling units, upgrade utilities to convert steam system to low temperature hot water, and comply to modern building codes and fire protection standards. Construction start - June 2026, substantial completion - May 2028, final completion/demobilize June 2028.

Post-Bid

Residential Subdivision

$367,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
36
Bidding Soon
923
All Active Projects
393
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

June 1, 2026

img_map_placeholder

2200 Baker Dr, Boulder, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.