Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a bridge / tunnel in Tichnor, Arkansas. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
PRESOLICITATION NOTICE FOR: Design-Bid-Build of Three Rivers Phase 2 Hydraulic Containment Structure and Modifications to Owens Lake and LaGrues Lake Culverts, McClellan-Kerr Arkansas River Navigation System, Arkansas County, Arkansas W9127S24R0002 The US Army Crops of Engineers, Little Rock District (CESWL), has been tasked to solicit and award a Design-Bid-Build competitive negotiation procurement in order to obtain construction services for a Hydraulic Containment Structure and Modifications to Owens Lake and LaGrues Lake Navigation System on the McClellan-Kerr Arkansas River Navigation System, Arkansas County, Arkansas. The North American Industry Classification System (NAICS) Code is 237990 - Other Heavy and Civil Engineering Construction. The US Small Business Administration Size Standard is $45M Project Description: The general scope of the requirements will be Construction of a new containment structure (top elevation 157), installation of a bridge culvert into Owens Weir, replacement of culverts at La Grues Lake, and associate work; located in Arkansas County, near Tichnor, AR. Provide all management, tools, supplies, parts, materials, equipment, transportation, and trained labor necessary for the engineering, and construction of hydraulic structures from materials that can include, but are not limited to, soil cement, concrete, riprap constructed from rock gradations up to R7400 (see Gradation charts in appendix), sheet piling, seepage cutoff walls, culvert installation, underwater excavation and rock placement, and relocation of private fiber optic lines. Project features include Construction of the following: a. Hydraulic containment structure, with a crest elevation 157-ft NAVD88 b. Portions of the access road can be inundated and temporarily closed due to river elevation fluctuations; barge/boat transportation of equipment, personnel, and supplies should be expected when working at or above the water elevation that causes the road closure. c. Access road along the top of the containment structure, as indicated. d. Borrow Material. Fine-grained material that may be needed for an impervious earthen embankment is scarce or not available at the site. The material will need to be imported from an offsite source, or the available coarse-grained material be blended/modified to meet a maximum hydraulic conductivity of 3.28E-05 ft/sec. Pervious or coarse grained material can be obtained Dredge Disposal Area 2 or Dredge Disposal Area 3 shown on the drawings. e. Fiber Optics relocation and replacement and encasement of fiber optics line along La Grues. f. Portions of the project site are above elevation 168-ft NAVD88 and can be used as construction staging areas of sufficient elevation to avoid inundation. The 2011 Mississippi event was estimated as a 1 percent Annual Exceedance Probability (AEP) Mississippi River flood event. During this event, river elevations were approximately 168-ft NAVD88 as measured at Montgomery Point Lock and Dam gage on the White River, and 166-ft NAVD88 at the Yancopin railroad bridge gage on the Arkansas River. g. Depending on river levels, underwater excavation/construction/rock placement can exceed 30 feet. h. The finished structure must consist of a low maintenance top driving surface that is conducive to inspections and access by vehicles. The structure must be constructed to withstand damages including but not limited to overtopping, scour, slope failures, uplift, and settlement. The top driving surface must be constructed to minimize routine maintenance and repairs throughout the life of the structure. i. Replacement of existing corrugated metal pipe culverts with precast box culverts and placement of bedding stone and riprap on the culvert abutments at La Grues. j. Partial demolition of Owen's weir and placement of new prefabricated bridge culvert with soil and soil cement backfill. k. Remove Menard Bayou Bridge Bypass on Benzal Road upon completion of project (approximate location: 34 0'57.44"N, 9111'21.27"W). Estimated Value Range: In Accordance with FAR 36/DFARS 236, the estimated value for this requirement is between $65M and $75M. Estimated Schedule Dates: Issue Solicitation: May 8, 2024 Construction Contract Award: December 5, 2024 Contract Completion: July 27, 2028 All solicitation documents will be available when the solicitation is released. The proposed contract will be competitive firm-fixed price contract procured in accordance with FAR 15, Negotiated Procurement using the Best Value Trade-Off process. There will no public bid opening. The Government will evaluate and select for contract award the contractor that provides the best value to the Government. All contractors shall submit a proposal that includes a technical volume and a price volume. The proposals will be given consideration for both the technical evaluations factors and price. Small Business & 8(a) participants are reminded under FAR 52.219-14, Limitations on Subcontracting, DOD will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85 percent subcontract amount that cannot be exceeded for general construction-type procurement. Solicitation will be issued as a Request for Proposal (RFP). This solicitation will be issued via Procurement Integrated Enterprise Environment (PIEE), https://piee.eb.mil/sol/xhtml/unauth/index.xhtml and the Government Point of Entry (GPE), www.sam.gov. Amendments to the solicitation will be issued via the GPE/PIEE as well. It is each offerors responsibility to download the solicitation and monitor the sites for updates. Offerors must be registered with the System for Award Management (SAM) in order to submit a proposal in response to this solicitation. Contractors may register for SAM at no cost to them at the following website: www.sam.gov. All questions or comments should be forwarded in writing via email to Deborah Oswalt Deborah.Oswalt@usace.army.mil and Marcus Mitchell Marcus.D.Mitchell@usace.army.mil. The Method of Contractor Selection has not been determined at this Time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Bridges / Tunnels
$75,000,000.00
Public - Federal
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 24, 2024
Multiple Locations, Tichnor, AR
Related To This Project
Tichnor, AR
Bid Date: Sep 08 2020
Tichnor, AR
Bid Date: Oct 30 2024
Tichnor, AR
Bid Date: Aug 31 2022
Fayetteville, AR
--
Clinton, AR
Bid Date: Jan 16 2024
Caraway, AR
Bid Date: Jan 31 2024
Hot Springs National Park, AR
Bid Date: Feb 12 2024
Fayetteville, AR
--
Siloam Springs, AR
Bid Date: Jan 25 2024
Centerton, AR
--
Centerton, AR
--
Centerton, AR
--
Centerton, AR
--
Centerton, AR
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.