BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2024 at 8:00 PM

Updated May 31, 2024

Site work, paving and renovation of a mixed-use development in Detroit, Michigan. Design plans call for the renovation of a 198,903-square-foot, five-story above grade educational facility; for site work for a road / highway; and for paving for a road / highway.

As of May 30, 2024, an architect has been selected for the project. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: DPSCD is seeking Design Professional firms for the renovation of two existing facilities. Renovations will include architectural, mechanical, electrical, lighting, building automation/controls systems, and site improvement work, including concrete and asphalt. Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation. The Detroit Public Schools Community District is seeking sealed bids/proposals from qualified firms to furnish the goods and/or services identified in the specifications document. Question Deadline 01/23/2024 at 12:00 PM ET The project schedule is as below or earlier based on school specific scope of work: Design Phase: March - August 2024 Bid / Procurement - August 2024 - May 2025 Construction - June 2025 - July 2026 Turnover / Move in - August 2026 DPSCD is seeking Design Professional firms for the renovation of two existing facilities. Renovations will include architectural, mechanical, electrical, lighting, building automation/controls systems, and site improvement work including concrete and asphalt. The Design Professional is to develop a renovation scope of work aligned with DPSCD's project budget constraints. The two identified facilities are: Coleman A. Young (CAY) 15771 Hubbell Ave, Detroit, MI 48227 1. Currently occupied Pk-5 Elementary School 2. Approximately 67,800 SF, two-story building. 3. Scope includes ceiling replacement, lighting, elevator refresh, HVAC and controls, electrical upgrades, doors, windows, and sitework. 4. Budget: $5,465,000 Foreign Language Immersion and Cultural Studies School (FLICS) 6501 W. Outer Dr., Detroit, MI 48235 1. Currently occupied Pk-8 Elementary/Middle School 2. Approximately 131,103 SF, three-story building with partial basement. 3. Scope includes elevator replacement, cooling, electrical upgrades, and roofing. 4. Budget: $4,157,000 The method of Contractor Selection has not been Determined at this time.

Design

Educational

$9,622,000.00

Public - City

Paving, Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
361
Active Projects
122
Bidding Soon
2,724
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

Project location map

Multiple Locations, Detroit, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.