EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 17, 2024 at 7:00 PM

Updated February 18, 2024

Site work for a transportation facility in Romulus, Michigan. Completed plans call for site work for a transportation facility.

Reference Number 0000339645 Question Acceptance Deadline 01/26/2024 02:00 PM EST Questions are submitted online No, All questions regarding this RFB must be submitted to the Procurement Contact at the above number and email address. Procurement Contact: Darwin Hadley, Solicitation Manager Phone: 734.247.7900, Fax: 734.955.5648 Purchasing.questions@wcaa.us The Wayne County Airport Authority (Airport Authority) is soliciting bids from general contractors, construction managers and other businesses that meet the qualifications set forth herein to provide and install concrete duct bank, primary electrical cable, and terminations; new transformers; primary load break switches; relocation of utilities (electrical); and necessary commissioning and testing at Detroit Metropolitan Wayne County Airport (DTW). (The Contract resulting from this solicitation is subject to Davis-Bacon Act Wages Requirements.) Buyer Preferences, Guidelines & Requirements Participation Requirements - Small Business Participation General Requirements - Bid Deposit Required - Certified Payroll - FOB Destination - Installation Required - Insurance Required - Irrevocable Letter of Credit - Local Service Required - Prevailing Wage Required - Safety Standards Plan - Security Badges Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % The Bidder is required to submit a refundable Bid Guarantee (an AIA 310 Bond from a surety licensed to conduct business in the State of Michigan or cashier's check) in the amount of 5% of the Bidder's total potential value of the Base Bid The Airport Authority reserves the right to cancel this solicitation, in whole or in part, as well as reject any or all bids, or to accept or reject any bid in part, and to waive any minor informality or irregularity in bids received if it is determined by the Chief Executive Officer (CEO) or his designee that the best interest of the Airport Authority will be served by so doing. If the solicitation is cancelled or all bids are rejected by the Airport Authority.

Post-Bid

Transportation Terminals

$200,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Panel Doors
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
93
Bidding Soon
1,635
All Active Projects
688
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2024

March 20, 2024

img_map_placeholder

2562 Worldgateway Pl, Romulus, MI

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Primary Electrical Distribution Upgrades- Loop 3

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.