BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Southaven, Mississippi. Completed plans call for site work for a playground / park / athletic field.

Bids on the Project must be received on or before the period scheduled for the project and no bid withdrawn after the scheduled closing time for the project for a period of forty-five (45) days. All bids submitted in excess of $50,000.00 by a Prime or Subcontractor to do any erection, building, construction, repair, maintenance, or related work must comply with the Mississippi Contractors Act of 1985, by securing a Certificate of Responsibility from the State Board of Contractors. The Owner reserves the right to reject any and all bids on any or all projects and to waive informalities. THIS PROJECT CONSISTS OF THE NEW CONSTRUCTION OF EIGHT NEW TENNIS COURTS, A RESTROOM BUILDING, AND TWO CANOPIES AT AN EXISTING TENNIS FACILITY. ADDITIONAL PARKING WILL BE ADDED TO THE EXISTING PARKING LOT. Location for Receipt of Bids: Bid for Southaven Outdoor Tennis Expansion Phase II City Clerk, City of Southaven 8710 Northwest Dr. Southaven, Mississippi, 38671 Each bidder or bidders subcontractor must have completed (5) similar tennis court projects, and must provide owner with a list of these jobs completed within the last 5 years. A. The project consists of the construction of 8 new concrete, post tensioned tennis courts, tennis court surfacing, all associated gates and fencing, screening, and lighting as indicated in the drawings in Southaven Mississippi. The project also includes the construction of a masonry restroom building and 2 pre-engineered canopies all with metal roofing. The work shall include all architectural, civil, structural, mechanical, plumbing, and electrical work, and the following as part of the Work: 1. All utilities as required for building operation both from inside the building to 5'-0" outside the building, and from 5'-0" outside the building to the appropriate main service line as coordinated with utilities provider or other applicable city officials. This includes tap fees, meters, connections, electrical transformer, and pad (as required), and all other Work related to utility provision and installation as required for complete operation. B. All items furnished for the Work shall be new. All work shall be accomplished in a manner acceptable to the Owner and Architect. C. Materials and Labor required to complete Work called for in the Contract Documents are to be furnished and performed in a faithful and thorough manner. D. It is understood that, except as otherwise specifically stated in the Contract Documents, the Contractor shall provide and pay for all materials, labor, tools, equipment, connections, permit fees, service lines to meters by Utilities, transportation, superintendent, temporary construction, services, facilities and all cost to execute and complete the entire Work being done under the Contract Documents and deliver it complete and ready for it's intended use. E. The Contractor shall perform all Work as described in the accompanying Sections of this Project Manual and shown on the Drawings, both as enumerated generally in the Index to Specifications and Drawings Index. F. Provide to the Owner a completed building. The Contractor shall furnish and install all items, whether specifically shown or specified, that are necessary or required to furnish a complete, water-tight, weather-proof building.

Under Construction

Playgrounds / Parks / Athletic Fields

$2,441,731.00

Public - City

Site Work

45

19

16

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
91
Bidding Soon
754
All Active Projects
346
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 9, 2024

March 8, 2024

img_map_placeholder

3750 Freeman Ln, Southaven, MS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.