BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2024 at 7:00 PM

Updated February 15, 2024

Renovation of a residential development in Hampton, South Carolina. Completed plans call for the renovation of a residential development.

QUESTIONS DEADLINE: JANUARY 19, 2024, AT 12:00 NOON This federally assisted contract will obligate the contractor and subcontractors to comply with local, state, and federal regulations for employment and business practices. The Contractors and Subcontractors must comply with the applicable Davis-Bacon Act; HUD Maintenance Wage Rate; Federal Labor Standards provisions; and Section 3 Provisions of the Housing and Urban Development Act of 1968. Minority and Women-Owned Businesses and Veterans are encouraged to respond. CHA reserves the rights to retain all proposal packages submitted and use any idea in a proposal package regardless of whether the package is selected and reserves the right to wave irregularities, to reject any/and all proposals, and to re-advertise this project in accordance with any state, local and federal regulations. The project is divided into two (2) lots. Each lot is considered separately for bid award. The Scope of Work and this project manual applies to all of the addresses of all of the lots. Each Apartment must be completed within 14 working days of the date work has commenced on the apartment. The entire Lot must be completed including all punch work within 75 seventv-five calendar days from the date of Notice to Proceed for the first apartment. 4. Supply and install new 0.5 HP garbage disposal at sink to include the supply and installation of all necessary electrical and plumbing connections and wall mounted switches and plates. Coordinate switch location with CHA. 5. Contractor to coordinate with owner to pick up appliances from CHA warehouse. 6. Contractor shall unpack, install and connect power and water supply (to include electrical and/or gas connections) CHA provided appliances to include range, ventless hood and refrigerator. 7. Supply and install necessary plumbing and associated connections for water line to new refrigerator. Bid Result Lot 1 Howell & Howell Co. $197,798 Lot 2 Smithco Service $240,000

Award

Residential Subdivision

$254,446.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
77
Bidding Soon
1,001
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

March 4, 2024

Project location map

Multiple Locations, Hampton, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.