BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Louisville, Kentucky. Completed plans call for the renovation of a educational facility.

Bids may not be withdrawn for a period of 45 days after the designated time for receipt of bids. Contractor's Profile form, if not currently on file, is due prior to award of a contract. The Jefferson County Board of Education provides equal opportunities to all of its bidders with respect to the bidding and award of construction contracts. Jefferson County Public Schools requires that the bidder submit to the Facility Planning Unit, with the bid, the following information: 1. Proposal Form-properly signed, with completed unit prices and listing of all sub-contractors at time of submittal. A listing of manufacturers shall be submitted within 1 hour following the bid. 2. Bid Security-properly signed, witnessed and executed. 3. Minority, Women, and Veteran Business Enterprise Sub-contracting Plan; Contractor's Good Faith Effort Summary Sheet, Affidavit, and Supplemental Sheet--properly completed, signed, and dated. The Owner reserves the right to accept any bid, reject any or all bids, to waive any informalities in bids received where such acceptance, rejection or waiver is considered to be in the best interest of the Owner, and to reject any bid where evidence or information submitted by the bidder does not satisfy the Owner that the bidder is qualified to carry out the details of the contract documents. Refer to spec section "JCPS Amendment to the General Conditions of the Contract for Construction" for "liquidated damages" and substantial/final completion dates. Refer to spec section "JCPS Amendment to the General Conditions of the Contract for Construction" for requirements for 100% performance and payment bonds. The project consists of the removal of (2) two Aerco hot water boilers and associated piping and the installation of two new gas-fired condensing-type boilers, boiler circulating pumps, and interconnecting piping. It also consists of the installation of DDC input/output points for the HVAC equipment. Electrical work includes power supply for the boilers and boiler pumps, emergency boiler shut-off, and miscellaneous conduit for controls. IF YOU HAVE ANY QUESTIONS ABOUT THESE SUBMITTALS PLEASE CONTACT RYAN KIDD, DATA MANAGEMENT RESEARCH TECHNICIAN AT (502) 485-6107.

Award

Educational

$132,940.00

Public - County

Renovation

11

13

2

6

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
55
Bidding Soon
959
All Active Projects
395
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2024

March 7, 2024

img_map_placeholder

5749 New Cut Rd, Louisville, KY

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.