BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 16, 2024 at 8:00 PM

Updated March 17, 2024

Site work and paving for a mixed-use development in Lakeland, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The improvements under this Contract consist of milling and resurfacing, widening, pavement reconstruction, median modifications, curb and gutter, drainage improvements, sidewalks, driveway reconstruction, signing and pavement markings, lighting, and signalization on SR 546/SR 600 (US 92) from west of Gary Road to west of SR 659 (Combee Road) in Polk County. Counties: Polk Road Name: SR 546 Limits: 16020000 Project(s): 44743215201(*) Federal Aid No: N/A Project(s): 44743215202 Federal Aid No: N/A Total Roadway Length: 3.974 Miles Contract Days: 190 Total Bridge Length: 0.000 Miles Total Proposal Length: 3.974 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Acquisition Days Description: The improvements under this Contract consist of milling and resurfacing, widening, pavement reconstruction, median modifications, curb and gutter, drainage improvements, sidewalks, driveway reconstruction, signing and pavement markings, lighting, and signalization on SR 546/SR 600 (US 92) from west of Gary Road to west of SR 659 (Combee Road) in Polk County. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FLDOT - Call Order: 002 Milling and Resurfacing - SR 546 Question Deadline 02/08/2024 at 5:00 PM ET Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online.

Award

Roads / Highways

$3,665,572.00

Public - State/Provincial

Paving, Site Work

53

7

8

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
363
Active Projects
157
Bidding Soon
2,519
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

April 15, 2024

Project location map

FL-546, Lakeland, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.