Site work and paving for a bridge / tunnel in Lewisburg, Pennsylvania. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The estimate is as follows: Contract 2024-1: $600,000 Contract 2024-2: $80,000 Contracts 2024-01 and 2024-02 include rehabilitation of three Nittany and Bald Eagle Bridges at mileposts 16.75, 26.01 and 36.90. Work includes, but is not limited to, reinforced concrete repairs, stone masonry repointing, placement of riprap, reinforced concrete deck rehabilitation, installation of scour countermeasures, and approach track work. Erosion and sedimentation pollution control, temporary access, and traffic control is also included. Addenda, if any, will be issued to only those persons whose name and address are on record with the Engineer as having obtained the Contract Documents. Question Deadline 01/31/2024 at 12:00 PM ET All questions about the meaning or intent of the Bidding Documents are to be sent in writing to Stiffler, Mc-Graw & Associates in accordance with the Instructions to Bidders. Telephone inquiries are unacceptable. Each bid shall be accompanied by a Certified Check or Bid Bond in an amount of not less than ten percent (10%) of the bid total. The bidders' attention is called to the fact that not less than the minimum prevailing wages, must be paid on this project and bids shall be prepared accordingly in accordance with the bid documents. All bids shall be irrevocable for 60 days after the bid opening date, with the right to extend thetime to 120 days if additional time is required due to approval of another government agency. The SEDA-COG Joint Rail Authority reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of the SEDA-COG Joint Rail Authority, and to reject any or all bids. Project Summary: Jason reviewed the scope of work for the three projects. The work involves rehabilitation and improvements on NBER Bridges 16.75, 26.01, and 36.90. Jason noted that the three projects are separated into two contracts, with one contract containing Bridge 16.75 and Bridge 36.90 (Contract No. 2024-01) and the other containing Bridge 26.01 (Contract No. 2024-02). The work at each structure includes, but is not limited to: o Bridge 16.75 o Shotcrete repairs to concrete deck overhangs and fascias. o Placing liquid applied waterproofing membrane on the deck at Piers 1 and 2. o Shotcrete repair at NW wingwall with placement of R-6 slush grouted rip-rap. o Concrete blister repair at the West Abutment backwall Replacing deck overhang brackets and timber walkway and curbing at select locations. o Stone masonry repointing on Pier 2 footing. o Stone masonry repointing and epoxy injection crack seal at the East Abutment. o Cleaning and flushing all beam seats. o Installing intrusion grout bags in front of East Abutment. o Bridge 26.01 o Removal of existing concrete slab superstructure with substructure to remain in place. o Placement and backfilling of new 24" diameter HDPE pipe with rock lining at the upstream and downstream ends. o Track work on each approach and over the pipe culvert. o Bridge 36.90 o Replacing select timber deck ties. o Concrete blister repairs at each abutment. o Stone masonry repointing at each abutment above water.

Award

Bridges / Tunnels

$956,138.00

Public - State/Provincial

Paving, Site Work

39

33

20

7

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Fabricator Qualifications, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Accessories, Cast-in-Place Concrete, Structural Concrete, Specialty Placed Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells, Other Equipment, Horticultural Equipment, Seeders
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture, Seating, Chairs
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation, Common Work Results for Transportation, Common Work Results for Railways, Guideways/Railways, Rail Tracks
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
65
Bidding Soon
851
All Active Projects
334
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2024

April 8, 2024

img_map_placeholder

Multiple Locations, Lewisburg, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2021 RTAP Bridge Rehabilitation Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.