EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 21, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Casey, Illinois. Completed plans call for the renovation of a educational facility.

Work shall include replacement of an existing boiler at Monroe Elementary School, along with other miscellaneous associated work at Casey Westfield High School located in Casey, Illinois. All work shall be bid under one prime contract. All bidders shall submit and enclose with their bid signed certifications that the contractor is not barred from bidding on the contract as a result of a violation of either Section 33E-3 or 33E-4 of Article 33E, Public Act 85-1295 (Senate Bill 2002) effective January 1, 1989. Certification must be submitted on the form furnished in the Project Manual. Each bid shall be accompanied by a bid deposit in the form of a certified check or bid bond in the amount of 5% of the base bid, payable to the Casey-Westfield Community Unit School District No. C-4, Casey, Illinois. A Performance Bond and Payment Bond will be required of the bidder(s) to whom a contract is awarded. Bid documents info : All Prime Contractors requesting Bid Documents sent to them, will be shipped via UPS Ground and the contractor shall remit a separate check (non-refundable) made payable to the A/E in the amount of $25.00 per set for shipping and handling Plans and specifications for the subject project will be available at the Office of the A/E, GreenAssociates, Inc., 1413 South MacArthur Blvd., Springfield, IL 62704, (217) 522-3355; and on file at the Office of the Superintendent located at the Board of Education Office, 401 E. Main Street, Casey, IL. Contractors submitting proposals shall complete them in accordance with schedule in Instructions to Bidders. When the word Owner occurs in the Contract Documents, it shall apply to the Board of Education, Casey-Westfield Community Unit School District No. C-4, Casey, Illinois, or its authorized representative. When the word Contractor occurs, it shall apply to any firm or individual having a direct contract with the Owner. When the word Subcontractor occurs, it shall apply to any firm or individual having a direct contract with the Contractor. All bidders are advised that the law concerning prevailing wage rates shall comply with all requirements of the Illinois Prevailing Wage Act. The latest published prevailing wage rates have been included within the Project Manual along with stipulations on updates by the Office of the State of Illinois, Department of Labor, telephone 217/782-6206.

Post-Bid

Educational

$100,000.00

Public - City

Renovation

7

10

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Ceilings, Acoustical Ceilings
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
32
Bidding Soon
306
All Active Projects
175
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

June 3, 2024

img_map_placeholder

301 E Monroe Ave, Casey, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Boiler Replacement Ph. 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.