Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, asbestos abatement and renovation of a municipal facility in Tupper Lake, New York. Completed plans call for the renovation of a municipal facility; for asbestos abatement for a municipal facility; and for site work for a municipal facility.
Asbestos Abatement and Reinsulation Various Basements/Crawlspaces - Phase 2 Minority Business Enterprise Goal 4% Women's Business Enterprise Goal 4% Service Disabled Veteran Owned Businesses 6% In the amount of five percent (5%) of the base bid amount, each bid must be accompanied by a certified check of the bidder made payable to the Dormitory Authority or by a bid bond prepared on the form of bid bond included in the Contract Documents, duly executed by the bidder as principal, and the surety thereon. Bidder failure to provide bid security as prescribed, may result in rejection of the bid. Bid bonds submitted as bid security shall contain an original signature of both the bidder and the surety providing the bid bond in the space provided on the Form of Bid Bond. The surety shall be authorized to do business in the State of New York by the New York State Department of Financial Services, rated at least A- by A. M. Best and Company, or meet such other requirements as are acceptable to the Owner in its sole and exclusive discretion. Simultaneously with the delivery of the signed Agreement, the successful bidder shall furnish to the Owner and maintain, at its own cost and expense a Performance Bond in an amount at least equal to one hundred percent (100%) of the Contract amount as security for faithful performance of the Contract and also a Payment Bond in an amount at least equal to one hundred percent (100%) of the Contract amount for the payment of all persons performing labor under the Contract or furnishing materials for the Contract. The Performance Bond and Payment Bond surety must be authorized to do business in New York State by the NYS Department of Financial Services, rated at least A- by A.M. Best and Company or meet such other requirements as are acceptable to the Owner in its sole and exclusive discretion. All the Work of the Contract Documents shall commence at the time to be specified in the Notice to Proceed and the Contractor shall achieve Substantial Completion: no later than July 15, 2024, for the CR29 Asbestos Abatement work, Work is scheduled for basement and crawlspace areas of Buildings 2, 3, 6 and 7 of the Sunmount DDSO Facility in Tupper Lake, NY. Project includes temporary mechanical system isolation and shutdowns, asbestos abatement with enclosure of soil floors, and reinsulation of pipes after abatement. B. Section includes a summary of each Contract for the Project, including responsibilities for coordination and temporary facilities and controls. C. Specific requirements for the work of each Contract are also indicated in individual Specification Sections and on Drawings for each Contract. Question Deadline 03/14/2024 Every request for such interpretation must be received at least ten (10) days prior to the date fixed for the opening of the bid.
Award
Municipal
$499,300.00
Public - State/Provincial
Asbestos Abatement, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2024
April 29, 2024
2445 NY-30, Tupper Lake, NY
Related To This Project
Tupper Lake, NY
--
Tupper Lake, NY
Bid Date: Apr 03 2024
Tupper Lake, NY
Bid Date: Mar 21 2024
Tupper Lake, NY
Bid Date: May 14 2024
Tupper Lake, NY
Bid Date: Jul 15 2024
Tupper Lake, NY
Bid Date: May 29 2024
Tupper Lake, NY
Bid Date: May 29 2024
Tupper Lake, NY
Bid Date: Dec 20 2023
Tupper Lake, NY
Bid Date: Mar 06 2019
Tupper Lake, NY
Bid Date: Feb 21 2020
Tupper Lake, NY
Bid Date: Feb 21 2020
Tupper Lake, NY
Bid Date: Feb 21 2020
Tupper Lake, NY
Bid Date: Dec 13 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.