Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Sacramento, California. Contact the soliciting agency for additional information.
The Department of Water Resources (DWR), Division of Operations and Maintenance, invites qualified firms to submit a Statement of Qualifications (SOQ). The services to be provided will be on-call, as directed, Construction Project Management Services (CPMS) in the areas of construction management and contract administration, inspection, and other CPMS related engineering and management services to support fire and life safety modernization CPMS. The specific work and deliverables are identified in Exhibit A, Description of Services, and will support the Division of Operations and Maintenance's Project Management Branch. ATTENTION: SIGNIFICANT UPDATES TO THE REQUEST FOR QUALIFICATIONS (RFQ) PROCESS ARE IDENTIFIED ON THIS COVER LETTER AND DESCRIBED FURTHER IN THE ATTACHED RFQ. THIS RFQ CONTAINS REVISED LANGUAGE AND A NEW FORMAT. PLEASE READ IN ITS ENTIRETY. DUE TO NEW NEGOTIATION REQUIREMENTS, PARTICIPATION IN THIS SOLICITATION REQUIRES MANDATORY ATTENDANCE OF THE PRE-SOQ CONFERENCE. Background The Department of Water Resources (DWR) manages the water resources of California in cooperation with other agencies, to benefit the State's people, and to protect, restore, and enhance the natural and human environments. The California State Water Project (SWP) generates power, controls floods, and provides water for irrigation and residential/industrial users. Major features of the SWP include 21 pumping and generating plants and 450 miles of aqueducts. Within the plants are over 120 hydroelectric units providing water pumping, power generation and pumped-storage generation. DWR's Operations and Maintenance (O&M) Division, Project Management Office, Project Support Section, is responsible for administering contracts for life safety and fire protection modernization upgrades to the SWP facilities. The life safety and fire protection modernization consist of replacements, upgrades, modifications, and installation of new fire detection and suppression systems along with additional life safety improvements at hydroelectric pumping-generating plants and other SWP facilities. The life safety and fire protection modernization of the SWP facilities was initiated in response to the catastrophic fire of Thermalito Pumping-Generating Plant (THPP) on November 22, 2012. In response to the fire at THPP, DWR initiated a review of the fire protection and life safety systems throughout the SWP, and the review concluded with the goals to modernize SWP facilities to meet the intent of current fire codes and design standards where practicable, to ensure the safety of those working at the plants and minimize the risk of another fire event similar to THPP. In addition to contract administration, O&M provides quality assurance inspections during the fabrication, installation, and commissioning phase for DWR construction projects to assure quality and adherence to contract requirements. Questions must be submitted in writing via email by 2:00 PM on Tuesday, January 23, 2024, to James Tedeschi at james.tedeschi@water.ca.gov Answers regarding general RFQ questions will be provided via addendum on Friday, January 26, 2024.
Conceptual
Municipal
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 6, 2025
Multiple Locations, Sacramento, CA
Related To This Project
Sacramento, CA
--
Sacramento, CA
Bid Date: Jan 29 2024
Sacramento, CA
Bid Date: Jan 26 2024
Sacramento, CA
--
Sacramento, CA
Bid Date: Feb 13 2024
Sacramento, CA
Bid Date: Feb 13 2024
Sacramento, CA
Bid Date: Feb 07 2024
Sacramento, CA
Bid Date: Apr 30 2024
Sacramento, CA
--
Sacramento, CA
Bid Date: Oct 15 2020
Sacramento, CA
Bid Date: Feb 16 2024
Sacramento, CA
Bid Date: Jan 29 2024
Sacramento, CA
--
Sacramento, CA
Bid Date: Feb 14 2024
Sacramento, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.