Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Mont-Joli, Quebec. Design plans call for site work for a road / highway.
The housing project is spread over three phases. The project consists of creating a range of apartment/condominium and single-family housing (Phases I and II) (Phase III). The City wants to build 450 housing units there in a set of up to 3 floor 20 buildings 24 units each. The professionals will have to establish the positioning while respecting the proposed surface areas, validate the flow rates of the existing sanitary sewer system, design the rainwater management system in order to avoid overloading the Lebrun stream, plan and design the landscaping, and design streets of new development. The first phase will be called Pelletier. The second phase will be called Lebel. The third phase will be analyzed based on single family dwellings planned from five to ten years from now. TIMELINE: Contract for engineering services to complete design and monitor construction work has been awarded. Reference number: 1799628. Preliminary design is to be completed by December, 2024. Design is to be completed by December, 2025. Tender documents are to be completed by early 2026. Construction for Phase 1 is expected to start in June, 2026, and complete in December, 2026. Construction for Phase 2 is expected to start in June, 2027, and complete in December, 2027. Further update in fall, 2024.
Design
Roads / Highways
$8,000,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
Rue Gendron, Mont-Joli, QC
Related To This Project
Mont-Joli, QC
Bid Date: Feb 29 2024
Mont-Joli, QC
Bid Date: Mar 14 2024
Mont-Joli, QC
Bid Date: Apr 15 2024
Mont-Joli, QC
Bid Date: May 09 2024
Mont-Joli, QC
Bid Date: May 09 2024
Mont-Joli, QC
Bid Date: May 21 2024
Mont-Joli, QC
Bid Date: Jan 04 2024
Mont-Joli, QC
Bid Date: Nov 20 2023
Mont-Joli, QC
Bid Date: Nov 29 2023
Mont-Joli, QC
Bid Date: Mar 04 2021
Mont-Joli, QC
Bid Date: Nov 16 2023
Mont-Joli, QC
Bid Date: Oct 17 2023
Mont-Joli, QC
Bid Date: Oct 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.