Published March 12, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Hartford, Connecticut. Completed plans call for the renovation of a educational facility.

Q&A (RFI) Due Date and Time 2/21/2024 2:00 PM PROJECT DESCRIPTION/SCOPE OF WORK: Hosmer Hall will require a complete re-wiring of the building of infrastructure cabling and WAO's this project also includes wireless access points. There will include the elimination of Telecomm Closets on the 2nd floor Room 213 and the 3rd Floor TR313. A. The Work of Project is defined by the Contract Documents and consists of the following: 1. The University is engaged in a multi-year project to upgrade its network equipment and wired access infrastructure to the University's current standards (WALR). As part of this effort, 2 of the 5 buildings at the Hartford School of Law will be upgraded. The buildings vary in size and level of changes required. 2. The contractor shall provide labor to install network switches and Power Distribution Units (PDU) in each Telecom Room (TR). Network switches and PDUs will be furnished by UConn ITS. The contractor shall provide labor to patch each station port to a network switch port in each TR. The contractor will provide documentation showing station port to network switch port in an Excel format, which will become part of the As-built documentation. Coordinate Patching Schedule with UConn ITS based on active services. Contractor shall provide patch cords. 3. The contractor shall replace all Wireless Access Points (WAPs) with new WAPs furnished by UConn ITS, unless otherwise noted. 4. The Contractor shall include a line-item price to survey existing conditions prior to execution of the project. This survey will evaluate existing ceiling conditions, pathways, and spaces to determine what can be reused and is accessible. B. The following is a summary of the scope of work for the 2 buildings. Please see the attached bid drawings for each building for further details and requirements 1. Hartford Law School Campus - Hosmer Hall a. (4) floors: Basement, First, Second and Third floors. b. (1) Existing TR 113 on First floor c. All new cables shall run to new TR 113. d. Install copper backbone from 011 to new TR 113. e. Extend fiber backbone from existing TR 113 fiber enclosure to new TR 113 fiber enclosure. f. Electrical upgrades shall be furnished and installed by others. g. Re-use existing pathways where possible. Install new pathways where needed and indicated on bid drawings. h. Install new CAT 6 and CAT 6 A cable to designated locations. i. Relabel all telecom and data cables, face plates and patch panels to meet UConn's labeling standard. j. Install owner provided Blockout jacks in all unused station ports. Unused station port locations to be provided by UConn ITS. All RequestsforInformation ("RFI") questions are to be posted under the Q&A Board Tab in the HuskyBuy sourcing event for this Solicitation. No phone calls or RFI questions emailed directly to the Procurement Agent will be accepted.

Post-Bid

Educational

$500,000.00

Public - State/Provincial

Renovation

18

5

8

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Glazing
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Pest Control Devices, Flags and Banners, Banners
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
616
Active Projects
363
Bidding Soon
4,822
All Active Projects
2,287
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

UConn Law School - Hosmer Hall (WALR)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.