Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Westfield, Massachusetts. Completed plans call for the renovation of a educational facility; and playground / park / athletic field.
Construction of 6 Post Tension Concrete Tennis Courts at the Westfield High School. This specification covers the application of a new wearing surface for Plexipave Tennis Courts and/or new or existing concrete tennis courts that have a sound, well-drained base of adequate thickness and stability. Surfaces should be properly sloped for good drainage, and free from cracks. The process consists of the repair of any minor depressions and cracks, followed by applications of the Plexipave System. Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions/Project Manual Appendices. Additional terms used in these Instructions to Bidders have the meanings indicated below: Issuing Office : The office from which the Bidding Documents are to be issued. City of Westfield Purchasing Department 59 Court Street, Room 101 Westfield, MA 01085 Email: n.reynolds@cityofwestfield.org Email: t.tefft@cityofwestfield.org Phone: (413) 572-6254 Fax: (413) 572-1708 SCOPE OF WORK A. Construct and maintain temporary silt fencing/ filter tube where shown on the plans and where other excavation or stockpiled material may cause erosion and sedimentation. B. Construct and maintain construction access tracking pads in locations shown on the plans. C. Temporary Seeding: Seed areas where surplus material is placed or stockpiled to provide temporary turf establishment. D. During the construction, the Engineer may direct the Contractor to install additional sediment controls for protection of drainage system at no additional cost to the Owner. E. Temporary pervious barriers using bales of hay, straw, or siltation tubes held in place with stakes driven through the bales and into the ground or sediment filter fabric fastened to a fence post and buried into the ground, shall be installed and maintained as required to check erosion and reduce sedimentation. F. Temporary vegetative cover shall be established on all unprotected areas that produce sediment, areas where final grading has been completed, and areas where the estimated period of bare soil exposure is less than 12 months. Temporary vegetative cover shall be applied if areas will not be permanently seeded by September 1. G. Construction Entrance (Anti-Tracking Pad): The construction entrances shall be located in the field. The Contractor will be responsible to maintain pad(s) (i.e. add stone, regrading, etc.) for the duration of the project. H. At the completion of the project, the Contractor shall remove and dispose of all temporary sediment and erosion controls, construction entrances, and restore all impacted areas to its original configuration. All material shall be disposed of in a proper manner in accordance with current regulatory standards and in legally acceptable disposal areas.
Award
Educational
$1,139,937.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 8, 2024
March 11, 2024
177 Montgomery Rd, Westfield, MA
Related To This Project
Westfield, MA
Bid Date: Feb 14 2024
Westfield, MA
Bid Date: Mar 12 2024
Westfield, MA
Bid Date: Mar 20 2024
Westfield, MA
Bid Date: Feb 25 2021
Westfield, MA
Bid Date: Feb 22 2024
Westfield, MA
Bid Date: Feb 14 2024
Westfield, MA
Bid Date: Apr 26 2024
Westfield, MA
Bid Date: Mar 07 2024
Westfield, MA
Bid Date: Jan 30 2024
Westfield, MA
Bid Date: Jan 03 2024
Westfield, MA
Bid Date: Dec 01 2023
Westfield, MA
Bid Date: Nov 21 2023
Westfield, MA
Bid Date: Nov 14 2023
Westfield, MA
Bid Date: Dec 05 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.