BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 6, 2024 at 8:00 PM

Updated April 7, 2024

Demolition, site work and addition to a power facility in Springfield, Missouri. Completed plans call for the addition of a 72-square-foot power facility; for the demolition of a 2,000-square-foot power facility; and for site work for a power facility.

Work includes underground site utility work for new sanitary sewer connection to City of Springfield's public sewer system. Additional domestic sewer line work for City Utilities operations and restroom addition. New domestic and fire service water line work connecting to existing City Utilities services. New restroom building addition to serve existing maintenance buildings personnel. City Utilities is ready to start this project immediately after the contract is awarded and as contracts are signed.

Award

Power Plant

$75,000.00

Public - City

Addition, Demolition, Site Work

9

15

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
35
Bidding Soon
648
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

March 4, 2024

Project location map

5701 S Kissick Ave, Springfield, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.