BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

Willowood Section One Water Line Rehabilitation. Estimate: $1,100,000.00 Scope This section covers the insurance to be provided by the CONTRACTOR for the project and is supplemental to SECTION 00700 General Conditions of Agreement. If conditions, requirements or limitations described in this section differ from those in SECTION 00700, Scope of Work The work to be performed under this Contract consists of furnishing all materials, labor, supervision, tools, equipment and incidentals and performing all work necessary to construct WILLOWOOD SECTION ONE WATER LINE REHABILITATION as specified in the proposal section of these documents. this section shall govern. Each bid proposal must be accompanied by a Bid Bond from a reliable surety company drawn to the order of HARRIS COUNTY WCID NO. 133 in the amount of five percent (5%) of the total bid. No bid proposal may be withdrawn for a period of sixty (60) days after the bid opening date. The OWNER reserves the right to reject any or all bids, or to accept the bid deemed most advantageous to it. The successful bidder will be required to provide a performance, payment, and maintenance bond for the full amount of the contract. The rehabilitation of a water line by pre-chlorinated pipe bursting method of approximately 5,000 linear feet of 8-inch and 12-inch water lines. The work to be done includes service reconnection, the replacement of valves within the line of interest, and performing all work necessary to construct the project as described. The OWNER reserves the right to reject any or all bids, or to accept the bid deemed most advantageous to it. The successful bidder will be required to provide a performance, payment, and maintenance bond for the full amount of the contract. All questions about the meaning or intent of the Contract Documents shall be submitted to ENGINEER. Replies will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the bidding documents. Questions received less than 72 hours prior to the date for opening of Bids will not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Post-Bid

Water / Sewer

$1,100,000.00

Public - County

Site Work

22

8

2

9

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
78
Bidding Soon
2,766
All Active Projects
979
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.