BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Jackson, Mississippi. Completed plans call for the renovation of a educational facility.

E-Rate School Replacement Switches For any questions concerning the process, or how to register, online. The Board of Trustees reserves the right to reject any and all RFPs, to waive informalities, and to withhold the acceptance of any RFP if approved for forty-five calendar days from the date RFPs/ are opened. There are two (2) options in which RFP proposals may be obtained. Question Deadline 02/08/2024 at 5:00 PM CT The selected vendor must be able to meet onsite with the JPSD IT staff to complete a schedule and scope of work before installations can begin. o Vendor will coordinate with JPSD to schedule deployments of hardware or software in such a way as to minimize the impact on network users, however, work will be completed during standard business hours. o Vendor may be required to deliver all equipment to the JPSD Fixed Asset department to have asset tags affixed if necessary. JPSD will coordinate with the vendor to schedule the delivery and installation.Vendors will be expected to pick up devices from the JPS Fixed Assets warehouse for delivery to school locations as scheduled if required. o Vendor will remove and dispose of all packaging and miscellaneous materials left over from any part of the installation and place all trash in an identified on-site dumpster or taken by the vendor to an offsite location. JPSD personnel will not dispose of any packing materials, nor should JPS school personnel be asked to dispose of any packing materials. o All additional cables, connectors, screws, labor, miscellaneous plug parts, transceivers, SFPs, jumpers, modules, etc. needed to make the new equipment or applications 100% operational should be included in the installation cost and provided by the vendor. Any costs not outlined in the vendor proposed budget that may be required for the successful completion of the installation are assumed to be provided by the vendor and at no cost to JPSD. o Hardware inventory will be provided to JPS by the vendor including but not limited to, device model number, serial number, MAC address, and location. Application licenses, keys, or serial numbers will also be provided to the district if necessary. o Vendor will install and mount all switch components in the designated rack at each location. The vendor will provide all required rack mounting hardware needed for installation and mounting if required. o Vendor will coordinate with JPSD IT staff to install and configure all software, appliances, and any other applications or technology required to make the devices 100% operational. The vendor will provide knowledge transfer to JPSD IT staff to demonstrate the functionality of all devices, monitoring systems, dashboards, or other components. o Vendors are expected to remove each of the existing switches from each rack and move them to a designated area in each building as part of the installation process. o Vendor should replace all old, existing patch cables with new patch cables as needed. Color requirement for all new patch cables: Blue o New patch cables should be of appropriate length to o Patch cables should be arranged in a neat and professional manner provide a finished appearance between all devices connected to the new switches. o All JPS fiber is multi-mode fiber. Due to the complexity and the amount o

Post-Bid

Educational

$100,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
11
Bidding Soon
221
All Active Projects
94
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

April 1, 2024

img_map_placeholder

Multiple Locations, Jackson, MS

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.