Published March 1, 2024 at 7:00 PM

Updated March 2, 2024

Demolition, site work, paving and new construction of a civil project in Paoli, Indiana. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.

Project Control No. 1900287, 1900291, 1900294, 1900295, 1900300, 2001057 Federal/State No. 1900287, 1900291, 1900294, 1900295, 1900300, 2001057 Slide Correction Orange County - Along Sr 145, 6.6 Miles North of Sr 164 (Rp 038+0021) Slide Correction Crawford County - Along Sr 237, 0.42 Mile South of I-64 (Rp 029+0022) Slide Correction Crawford County - Along Sr 237, 0.33 Mile North of Sr 62/sr 66 (Rp 030+0011) Slide Correction Perry County - Along Sr 37, 2.09 Miles South of Sr 70 (Rp 008+0080) Slide Correction Spencer County - Along Sr 66, 2.05 Miles West of Sr 70 (Rp 068+0084) Small Structures and Drains Construction Clv 237-013- 5.75 Culvert Crawford County - Along Sr 237, 0.57 Mile South of I-64/sr 234 (Rp 030+0010) Contractors desiring to submit electronic bids via Electronically must register with INDOT as a valid bidder by submitting the form provided on the INDOT Letting Information internet page. Failure to register will cause failure of the Electronic bid submission process. A bidder may request valid bidder status by submitting the bidder registration form until 9:00 AM on the bid opening date. An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids INDOT - Call 200 - Slide Correction, Small Structures and Drains Construction

Award

Bridges / Tunnels

$5,851,388.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

263

13

2

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Temporary Access Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Contaminated Site Material Removal, Underground Storage Tank Removal
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Collection and Disposal Equipment, Solid Waste Handling Equipment, Recycling Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Multiple Seating, Pews and Benches, Benches
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Batching Equipment, Mixers, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
49
Bidding Soon
830
All Active Projects
427
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

April 15, 2024

img_map_placeholder

Multiple Locations, Paoli, IN


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Slide Correction, Small Structures and Drains Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.