BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a civil project in Fenton, Missouri. Working plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

As of March 29, 2024, project was not awarded. No definite date for the rebid. This project consists of a cast in place (12'x12'x25' Deep) Duplex Pump Station with a CIP Valve Vault Assembly. Demolition of the existing Pump Station Building including the removal of Pumps, Piping, Electrical Components with the installation of a riser manhole to bring the existing structure to the new grade. Stationary Auxiliary Diesel Pump with housing. Electrical Component Block Building with VFD Controls, Control Panel, Transducer, Back-up float system, Scada, and new 200-amp electrical service. Site Utilities shall include 180 lineal feet of 12" DIP, 71 lineal feet of Class 200 - 12" diameter force main, 80 lineal feet of 3/4 " water service, 255 lineal feet of 4" PVC conduit with (2) - 40-foot directional bores. 1300 Sq Ft. of Block Retaining wall with 210 lineal feet of footing. 560 S.Y, of concrete pavement. 175 lineal feet of 7' high ornamental fence with 2-12' gates. All work for this project is confined within Roadway and Utility easement. In addition to the new Pump Station improvements, the site will be raised approximately 6 to 7 feet to contend with the present flooding condition. There will be 3500 CY of fill required to raise the site to this new grade. The District has excess material located at our Saline Creek Treatment Plant Site at 555 13th Street Fenton, Mo. This is located about 1.7 miles northwest of the new and existing pump station site. The contractor may elect to use other backfill around the structures and site such as, granular, screenings, or approved suitable backfill material. All work shall be constructed in a workmanlike manor for a complete and operational system. All work for these projects is confined within existing easements, within the Winter Valley Subdivision. Questions should be directed to Mr. Bob Hembrock, Executive Director, at Northeast Public Sewer District's Office. Jefferson County, Mo. 636-343-5090 Ext. 226 The District will consider such questions submitted in writing until Forty-Eight (48) Hours prior to the bid opening. All questions shall be submitted in writing to the Engineer prior to that time.

Final Planning

Water / Sewer

$2,012,303.00

Public - City

Paving, Site Work

13

18

7

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
54
Bidding Soon
791
All Active Projects
306
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2024

September 30, 2024

img_map_placeholder

Winter Valley Dr, Fenton, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.