BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 29, 2024 at 7:00 PM

Updated March 1, 2024

Site work and paving for a road / highway in Marion, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Section No 24-00000-00-GM City/County: Williamson Project Location: Combined Cmft and Cumft Letting Group A: Bituminous Material Applied at Jobsite 380,000 Gal Hfrs2p 15,500 Ton Agg Spread 15,500 Ton Roller 40,000 Gal Hfe-150 Applied Group B: Emulsified Asphalt 170,000 Gal Hfe-300 Group C: Surfacing Material at Jobsite 25,000 Ton Ca-10 Agg Group D: Surfacing Material, Fob Truck 10,000 Ton Ca-10 Agg Group E: Rip Rap, Rr3 at Jobsite 3,000 Ton Group F: Rip Rap, Rr3 Fob Truck 2,000 Ton Group G: Rip Rap, Rr1 at Jobsite 2,000 Ton Group H: Ca-2, 3" Minus at Jobsite 5,000 Ton Group I: Ca-2, 3" Minus, Fob Truck 2,500 Ton ILDOT - Group A: Bituminous Material Applied at Jobsite - Various Location This item of work shall consist of furnishing Emulsified Asphalt, HFE-300 and a pugmill mixer with a calibrated oscillating screed (Barber Greene or equal) for Bituminous Aggregate Mixture (BAM Base Mixture). All aggregate, Labor and other equipment necessary for the processing ofthe material will be furnished by the County; the material will be mixed at the county yard, Marion, Illinois. The work under this group will be completed on an as ordered basis.

Award

Roads / Highways

$2,394,940.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
69
Bidding Soon
971
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2024

March 8, 2024

Project location map

Multiple Locations, Marion, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.