Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
200 LEAD SERVICE LINE REPLACEMENTS PRIOR TO PAVING, by qualified City of Milwaukee licensed and bonded contractors. Qualified bidders shall have the necessary equipment and experience to replace lead service lines using trenchless methods including, but not limited to, the following (Pulling, Hole Hogging, Boring, Directional Drilling, and Pipe Bursting). All locations will be service line replacements due an upcoming paving project. Each location will require either the full replacement of the water service line from the municipal water main up to the interior water meter setting, or, at locations where a portion of the service line was previously replaced with copper, the replacement of the remaining lead portion of the service line. When the existing water meter setting is not code compliant, work will also include a new meter setting. Work may include, but is not limited to, the procurement of all necessary permits, a site visit prior to work beginning, scheduling the installation with the property owner, traffic control, erosion control, saw-cutting, excavation, installation of a new copper service line utilizing trenchless technology (MWW approval is required for open cut installation), tapping of the water main, abandonment of the lead service line, installation of an updated water meter setting up to and including the outlet valve, reconnection to the interior building piping, code-compliant restoration of the electrical ground wire, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Temporary and permanent restoration requirements will be at the discretion of MWW. The contractor will be requested to provide a second crew under this contract if the required emergency replacements exceed the capacity of one crew. Locations will be at various sites throughout the City of Milwaukee. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations. Time for Completion: The contractor shall begin scheduling work immediately following contract execution. 100 service line replacements, including associated site restoration, shall be completed by May 13, 2024.100 additional service line replacements (total of 200), including associated site restoration, shall be completed by July 29, 2024. The contractor will be required to mobilize to the designated location within 48 hours of notification and substantially complete the replacement within three City business days of notification. Substantial completion is considered restoration of water service to the property with a copper water service and backfilling all excavations. A maximum of one project working day is allowed for substantial completion at each site. Permanent restoration of pavement, curb and gutter, and walk will not be included in project working days if completed within one week (weather permitting) of substantial completion. MWW reserves the right to require site restoration immediately following the service installation if deemed necessary for traffic, safety, or public welfare. MWW reserves the right to assess daily contract per diem charges on projects which exceed allowable project working days. If a secondary contractor is utilized to perform work at a project site, MWW reserves the right to assess the cost difference in addition to the per diem. Liquidated Damages, per diem: $351.00 The residency requirement for this project is 40% of all hours worked on the project. One quarter of these hours must be attributable to residents living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53215, and 53233. The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. For a complete listing of City of Milwaukee certified SBE firms, see electronically. If there are any questions regarding SBE firms, please contact the OEI office at 414-286-5553. State of Wisconsin Disadvantaged Business Enterprise (DBE) Program contractors, including MBE's and WBE's, are encouraged to submit bid proposals. The apprenticeship requirements for this project are: 1 Construction Craft Laborer. If this contract is awarded at $500,000 or higher, 25% of all apprentice labor hours must be worked by apprentices certified for participation in the Residents Preference Program and 40% of all apprentice labor hours must be attributed to apprentices living in the following zip codes: 53204, 53205, 53206, 53208, 53210,53215, and 53233 The contractor shall specifically note the SBE, residency, and apprenticeship forms for this project If the forms are not filled out properly, it will be cause for rejection of the bid. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. For those bids being submitted through Bid Express and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works Contract Office by emailing DPWbids@milwaukee.gov. THE EMAILED COPY OF THE BOND MUST BE RECEIVED BY NO LATER THAN 10:30 A.M. ON THE SAME DATE THAT THE BIDS ARE DUE FOR THAT SPECIFIC OFFICIAL NOTICE, or the bid will be considered non-responsive. The original bid bond document must then be submitted by the contractor to the Department of Public Works Contract Office in-person or by mail to 841 N Broadway, Rm. 506, Milwaukee, WI 53202, immediately upon being notified that they are the apparent low bidder Any required addenda or response related to listed projects will be posted electronically. Call 414-286-3314 to have your company's name and contact information added to the plan holder's list. All Contractors awarded a contract valued at $25,000.00 or more are required to participate in training on the City of Milwaukee's B2GNow contract compliance software within 30 days of the contract award date. Throughout the contract term, Contractors are required to regularly provide timely subcontractor payment information in the City's contract compliance software. Please contact the Office of Equity and Inclusion (OEI) at 414-286-5553 should you have any questions or concerns regarding the training or reporting process. The Prime Contractor awarded this project is required to participate in training on the City of Milwaukee's Labor Compliance Reporting (LCR) Software after the date of contract award. Throughout the contract term, Contractors are required to regularly provide timely payroll information via LCR Please contact the DPW Contracts Office at 414-286-3314 should you have any questions or concerns regarding the training or reporting process. The City of Milwaukee has applied for funding for all projects in this contract through the Safe Drinking Water Loan Program (SDWLP) administered by the Wisconsin Department of Natural Resources. This contract is subject to the Davis Bacon Compliance Provisions. The contractor shall submit weekly payroll certification, utilizing the Payroll form included in the contract documents or equivalent All iron and steel products provided by the contractor shall be produced in the United States and comply with the American Iron and Steel Requirement (AIS) The City of Milwaukee has applied for funding for all projects in this contract through the Safe Drinking Water Loan Program (SDWLP) administered by the Wisconsin Department of Natural Resources. This contract is subject to Build America, Buy America (BABA) provisions. All iron and steel, manufactured products, and constructions materials, including Copper Pipe, used in projects must be or have been produced in a manner that complies with Build America, Buy America (BABA) unless a waiver of requirements is approved prior to commencement of any construction activities. Additional information regarding Build America, America (BABA) can be found electronically. 200 LEAD SERVICE LINE REPLACEMENTS PRIOR TO PAVING PROJECT NO. WK64409104 (PUBLIC SIDE REPLACEMENT) PROJECT NO. WK64409154 (PRIVATE SIDE REPLACEMENT)
Bid Results
Water / Sewer
$1,393,600.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 1, 2024
March 4, 2024
Multiple Locations, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Jan 29 2024
Milwaukee, WI
Bid Date: Feb 26 2024
Milwaukee, WI
Bid Date: Feb 26 2024
Milwaukee, WI
Bid Date: Feb 05 2024
Milwaukee, WI
Bid Date: Feb 26 2024
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Feb 06 2024
Milwaukee, WI
Bid Date: Mar 08 2024
Milwaukee, WI
Bid Date: Feb 02 2024
Milwaukee, WI
Bid Date: Feb 02 2024
Milwaukee, WI
Bid Date: Feb 21 2024
Milwaukee, WI
Bid Date: Jan 25 2024
Milwaukee, WI
Bid Date: Feb 12 2024
Milwaukee, WI
Bid Date: Feb 02 2024
Milwaukee, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.