BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Downingtown, Pennsylvania. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Awarded Bidders: General Construction Contract - E.R. Stuebner, Inc. for $9,141,000 Plumbing Construction Contract - Jay R. Reynolds, Inc. for $ 1,873,600 Electrical Construction Contract - S&S Electrical Services, Inc. for $2,793,000 Food Service Construction Contract - 11400 Inc. for $ 342,000 Contract Length is 3/14/2024 – 11/30/2025. In addition, the HVAC/Mechanical Construction Contract was pulled from approval due to a clerical error on the paperwork. This will be rebid with approval scheduled for April 3, 2024 at a Special Board Meeting. The project will include the addition of a bus entrance drive off Broad Run Road, south of the existing entrance to the school site. This drive allows for separation of the bus traffic from automobile traffic. The bus traffic will be rerouted to provide loading/unloading along the existing looped drive at the front of the building. Automobile loading/unloading will take place along the north face of the existing building. With the project including two additions, storm water collection will be addressed by the creation of a new underground detention basin as well as a new retention basin in the southeast corner of the site. The Work of this Project may be summarized as follows: Additions and Renovations to West Bradford Elementary School, including the Site and related building and selective demolition Work, as indicated on the Drawings and specified herein. SEALED PROPOSALS are invited by the undersigned for the project described as Additions and Renovations to West Bradford Elementary School PROPOSALS are invited on a lump sum basis for the following Contracts: Contract No. 1 - General Construction Contract No. 2 - Plumbing Construction Contract No. 3 - HVAC Construction Contract No. 4 - Electrical Construction Contract No. 5 - Food Service Construction PROPOSAL SECURITY shall accompany each proposal submitted in an amount equal to 10% of the total amount of the proposal, Base Bid. Except as permitted by Pennsylvania Act No. 4 of 1974, proposals may not be withdrawn by the bidder for a period not to exceed 60 calendar days following the actual date of the opening thereof, or, if award of contract is delayed by a required approval of another government agency, the sale of bonds or the award of grant or grants, the proposals may not be withdrawn by the bidder during the 120-day period following the date of bid opening. The successful bidder will be required to furnish surety bonds in the forms of the "Performance Bond and Payment Bond" required by the Contract Documents. Each bond shall be in a sum equal to 100% of the Contract Price and shall be executed by a surety company satisfactory to the Owner and qualified to do business in Pennsylvania. This Invitation to Bid supersedes any provisions to the Instruction to Bidders (A.I.A. Document A701), as modified by the Supplementary Instructions to Bidders, which conflicts with the provisions hereof. Prospective bidders are advised that this project is subject to and governed by the Pennsylvania Prevailing Wage Act including amendments and supplements thereto. The undersigned reserves the right to waive nonmaterial defects in or reject any or all proposals or parts thereof.

Award

Educational

$14,149,600.00

Public - City

Addition, Demolition, Renovation, Site Work

249

30

182

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
323
Active Projects
149
Bidding Soon
2,634
All Active Projects
1,266
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

May 10, 2024

img_map_placeholder

1475 Broad Run Rd, Downingtown, PA

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.