Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 19, 2024 at 7:00 PM

Updated February 20, 2024

Site work and paving for a civil project in Wausau, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work under this contract shall consist of asphalt patching areas of pavement which have been removed to repair water mains and other water utility maintenance. This work will include sawcutting, removing asphalt and any base course needed, asphalt and any incidentals necessary to complete the work included in this contract. Asphalt Patching 40,000 SF Sawing Asphalt 5,000 LF All work from the initial Utility Repairs list provided at the preconstruction meeting shall be completed by June 1, 2024. The Contractor will receive a new Utility Repairs list from the City Inspector each and every month from June through October, all Utility Repairs for each month's list shall be completed within 30 days of receiving that list. Repair of the City's infrastructure is ongoing, utility repairs made by the City up to October 15th shall be considered part of this project. The contractor shall accept the fact that the quantities may vary based upon the amount of utility work done. Should the contractor fail to complete this utility work within the time set above, the City will be enforcing the contract language in the General Conditions, Article 41 (Liquidated Damages) on page 27 of the General Conditions.

Award

Roads / Highways

$168,250.00

Public - City

Paving, Site Work

6

8

7

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
24
Bidding Soon
516
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

March 14, 2024

Project location map

Multiple Locations, Wausau, WI


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed