BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Kansas City, Missouri. Completed plans call for the renovation of a educational facility.

Window Air Conditioner Replacements for Multiple (9) Schools IFB Questions Due: February 7, 2024 at 4:00 PM CDT Answers/Addendum Due: February 9, 2024 at 4:00 PM CDT Liquidated damages. If the Contractor fails to achieve Substantial Completion within the Contract Time, the Contractor shall be liable for the sum of two hundred fifty dollars ($250.00) as liquidated damages, and not as a penalty, for each calendar day beginning on the first day after the Contractor fails to achieve Substantial Completion within the Contract Time until the date that Substantial Completion is achieved. All questions regarding this IFB shall be made electronically via e-mail and directed to Connie Fuimaono at bidquestions@kcpublicschools.org. The subject of the e-mail shall be "QUESTION - IFB C-24-15". Failure to provide the correct IFB number in the email will deem the question unanswerable and will not be considered as part of any addenda. Responses to all properly submitted questions will be posted on KCPS's E-bidding website as addenda to this IFB. The deadline for submitting questions on this IFB is February 14, 2024 at 2:00 PM CDT. Any questions submitted after that date and time will not be considered or answered.

Bid Results

Educational

$524,161.00

Public - City

Renovation

32

3

2

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
29
Bidding Soon
715
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

March 15, 2024

img_map_placeholder

Multiple Locations, Kansas City, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.